| Plan Review Notes For Project Z15080039 |
| Project Number |
Z15080039 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2015-12-11 12:57:51 | PASSED SUBJECT TO RIGHT TURN LANE AT SITE ENTRANCE ON | | | QUADRILLE AND SIGNAL WARRANT STUDY AT 4TH/QUADRILLE | | | | | | | | | 1.DATA INDICATES THAT A NORTHBOUND RIGHT TURN LANE ON | | | QUADRILLE AT 4TH STREET IS WARRANTED. HOWEVER, THERE IS | | | INADEQUATE RIGHT OF WAY TO CONSTRUCT THIS LANE. | | | 2. A RIGHT TURN LANE IS NEEDED AT THE SITE ENTRANCE ON | | | QUADRILLE. | | | 3. BASED ON THE TRAFFIC DATA, THE LEFT TURN MOVEMENT | | | FROM 4TH STREET TO SOUTHBOUND QUADRILLE MAY EXPERIENCE | | | SIGNIFICANT DELAYS IN THE PM PEAK. A SIGNAL WARRANT | | | ANALYSIS SHOULD BE PERFORMED AT THIS LOCATION. SIGHT | | | DISTANCE FROM 4TH STREET TO THE NORTH ON QUADRILLE | | | SHOULD BE MEASURED AS PART OF THE ANALYSIS AS THE ROAD | | | CURVES JUST NORTH OF 4TH STREET.. | | | |
| |
Print |
|