2016-06-28 07:56:29THIS IS A CONCEPTUAL LEVEL REVIEW OF WATER AND SEWER
 PLANS. ADDITIONAL COMMENTS ARE EXPECTED WHEN FULL
 DRAWINGS ARE SUBMITTED FOR ENGINEERING DEVELOPMENT
 APPROVAL. THE FOLLOWING COMMENTS INCLUDE THOSE
 DISCUSSED AT THE JUNE 6, 2016 PRE-ENGINEERING
 COORDINATION MEETING:
  
 PASSED WITH CONDITIONS FOR FOUNDATION PERMIT, SEE
 BELOW:
  
 1. PLEASE FIELD VERIFIY ALL WATER AND SEWER SERVICES
 PRIOR TO DEMOLITION. CUT AND CAP ALL INACTIVE SERVICES
 AND MAINS AT THE PROPERTY LINE FOR DEMOLITION PHASE.
 PERMANENT ABANDONMENT ARE TO BE CUT AND CAP AT THE
 MAINS. INACTIVE PIPELINES LARGER THAN 2" DIAMETER WILL
 BE REMOVED.
 2. PLEASE PROVIDE CCTV OF THE EXIST SANITARY SEWER ON
 5TH STREET
 3. THERE ARE ACTIVE WATER SERVICE CONNECTIONS ON THE
 NORTH SIDE OF 5TH STREET. THE EXISTING WATER MAIN ON
 5TH STREET IS TO BE REMAINED ACTIVE UNTIL THE NEW
 12-INCH WATER MAIN IS ACTIVATED AND RELEASED FOR NEW
 CONNECTIONS.
  
 GENERAL:
 1. RESEARCH AND OBTAIN ALL UTILITY FRANCHISE
 INFORRMATION WITHIN PROJECT LIMITS.
 2. PLEASE ADD EXISTING DRAINAGE INFORMATION.
 3. PLEASE SHOW ALL EXISTING UTILITIES (SERVICES AND
 MAIN LINES), CONFLICTS, AND CROSSINGS.
 4. OBTAIN SOFTDIGS TO CONFIRM VERTIVAL AND HORIZONTAL
 CLEARANCE AT UTILITY CROSSINGS BETWEEN PROPOSED AND
 EXISTING UTILITIES.
 5. PLEASE PROVIDE MEP CALCULATION (AVERAGE AND PEAK) TO
 SUPPORT METER SIZE SELECTION. PLEASE PROVIDE FIRE
 DEMAND.
 6. PLEASE PROVIDE WASTEWATER DEMAND (AVERAGE AND PEAK).
 7. PLEASE CALL OUT THE POINT OF SERVICE (WATER AND
 SEWER).
 8. PLEASE PROVIDE FIRE HYDRANT FLOW TEST DATA USED FOR
 DESIGN.
 9. PLEASE PROVIDE 5 FEET MINIMUM HORIZONTAL SEPARATION
 BETWEEN PROPOSED PIPELINES/STRUCTURES AND EXISTING
 WATER AND SEWER MAINS TO FACILITATE FURTURE
 MAINTENANCE/REPAIRS.
 10. PLEASE CALL OUT PRIVATE FACILITIES (FIRE HYDRANTS,
 ETC.), IF APPLICABLE.
 11. PLEASE MOVE THE PROPOSED DDCV, REDUCER ASSEMBLY,
 AND METER VAULT ADJACENT TO THE ROADWAY R/W.
 12. PLEASE MOVE THE PROPOSED CLEAN-OUTS ADJACENT TO THE
 ROADWAY R/W.
 13. PLEASE PROVIDE ENGINEERING CALCULATION FOR THE
 PROPOSED 12-INCH WM SIZING ON 5TH STREET. THE CITY'S
 SPECS CALLS FOR THE USE OF GATE VALVE, NOT BUTTERFLY
 VALVE.
 14. PLEASE PROVIDE ENGINEERING CALCULATION FOR THE
 PROPOSED 10-INCH GRAVITY MAIN SIZING ON 5TH STREET.
 15. PLEASE ADD THE PROFILE FOR THE PROPOSED 12-INCH
 WATER AND 10-INCH SANITARY SEWER MAINS ON 5TH STREET.
 16. CCTV RECORD (VIDEO AND TV LOG) OF THE PROPOSED SAN
 SEWER MAIN (FULLLENGTH FROMMH TO MH) AND SERVICES
 WITHIN THE ROADWAY R/W WILL BE REQUIRED AS PART OF THE
 PROJECT CLOSE-OUT SUBMITTAL.
 17. PLEASE INCLUDE APPLICABLE CITY OF WEST PALM BEACH
 STANDARD WATER AND SEWER DETAILS TO THE DETAILS SHEET
 (PIPE THRUST RESTRAINTTABLE, ETC). CONTACT THE
 ENGINEERING SERVICES DEPARTMENT (561) 494-1040 FOR THE
 LATEST REVISED DETAILS.
 18. THE CITY IS EVALUATING IMPACTS TO THE WATER AND
 SEWER SYSTEMS DUE TO INCREASED DEMAND.
  
 LAURA LE
 PUBLIC UTILITIES ENGINEER
 561-494-1093
 [email protected]
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved