Plan Review Notes
Plan Review Notes For Project Z15080034
Project Number Z15080034
Review Stop Z
Sequence Number 1
Notes
Date Text
2015-09-08 14:53:28PB 1600F
 PALM BEACH DAY ACADEMY REPLAT
 1901 SOUTH FLAGLER
  
 - CONTACT ERIC SCHNEIDER @ (561) 822-1446
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FIVE
 (5) PAPER COPIES AND AN ELECTRONIC COPY IN .PDF FORMAT
 OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS
 TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL
 COMMENTS.
  
 - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT
 RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS
 FROM THE DATE OF THE PPRC MEETING (BY NOVEMBER 9,
 2015), THE CASE SHALL BE CONSIDERED WITHDRAWN. ANY
 FURTHER ACTION SHALL REQUIRE A NEW DEVELOPMENT
 APPLICATION.
  
 - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($60).
  
 1) THE PEDESTRIAN ACCESS EASEMENT SHALL BE A MINIMUM OF
 FIVE (5) FEET WIDE FOR ITS ENTIRE LENGTH. THE SECTION
 NORTH OF THE PITT BUILDING SCALES AS NARROW AS 3.5 FEET
 IN WIDTH. ADDITIONALLY, THERE IS A LIGHT POLE SHOWN IN
 THIS AREA ON THE SITE PLAN THAT FURTHER REDUCES THE
 WIDTH OF THE PEDESTRIAN PATH TO LESS THAN THREE (3)
 FEET IN WIDTH. NOTE: THE PEDESTRIAN PATH NOTICE SIGNAGE
 SHALL NOT BE PLACED IN THE MIDDLE OF THE PATH, BUT OFF
 TO THE SIDE.
  
 2) THE SITE PLAN SUBMITTED WITH THE APPLICATION SHOWS
 AN OVERLAP OF THE LANDSCAPE BUFFER WITH THE PEDESTRIAN
 ACCESS EASEMENT AND PATH. THIS IN NOT PERMITTED.
 RESOLUTION NO. 144-11 SPECIFICALLY REQUIRES, "THE PLAT
 SHOWING THE PUBLIC PEDESTRIAN ACCESS EASEMENT SHALL
 INCLUDE THE CONDITIONS THAT THE PEDESTRIAN EASEMENT
 AREA SHALL NOT BE USED FOR THE PARKING OF VEHICLES, FOR
 THE LOCATION OF ANY REFUSE CONTAINER, OR FOR TEMPORARY
 OR PERMANENT LOCATION OF OTHER ITEMS WHICH WILL
 OBSTRUCT THE EASEMENT AREA." THIS LANGUAGE SHALL BE
 INCLUDED ON THE PLAT. ADDITIONALLY, RESOLUTION NO.
 144-11 REQUIRES THAT IF THE EXISTING ANNE NORTON
 SCULPTURE GARDEN MATURE TREES ALONG THE BUFFER ARE
 REMOVED, THEN THE PALM BEACH DAY ACADEMY SHALL INSTALL
 THE REQUIRED BUFFER TREES. THERE SHALL BE A FIVE (5)
 FOOT AREA, CLEAR OF UTILITY, DRAINAGE OR THE PEDESTRIAN
 ACCESS EASEMENT AVAILABLE ALONG THE SOUTH PROPERTY LINE
 FOR LANDSCAPE THAT IS SEGREGATED FROM THE PEDESTRIAN
 ACCESS EASEMENT.
  
 3) IN ACCORDANCE WITH RESOLUTION NO. 144-11, PALM BEACH
 DAY ACADEMY SHALL:
  
 A. GRANT TO THE CITY A TEMPORARY ACCESS EASEMENT FOR
 USE OF TUXEDO AND COCONUT LANES UNTIL THE ROADS ARE
 RELOCATED; EXISTING UTILITIES UNTIL RELOCATED; AND
 EXISTING DRAINAGE UNTIL RELOCATED, IN FORM ACCEPTABLE
 TO THE CITY.
  
 B. GRANT TO THE CITY A DRAINAGE AND FLOWAGE EASEMENT
 FOR ALL ON-SITE DRAINAGE AND FLOWAGE THROUGH THE
 BIOSWALE. PBDA SHALL BE RESPONSIBLE FOR MAINTENANCE OF
 ALL ON-SITE DRAINAGE.
  
 4) IN ACCORDANCE WITH RESOLUTION NOS. 341-10 & 342-10:
  
 A. ALL REQUIRED EASEMENTS SHALL BE PROVIDED EITHER BY
 PLAT OR SEPARATE INSTRUMENT, IN A FORM ACCEPTABLE TO
 THE CITY.
  
 B. IN THE EVENT THE UTILITIES ARE RELOCATED TO ANOTHER
 AREA OF THE PALM BEACH DAY ACADEMY CAMPUS, THE PALM
 BEACH DAY ACADEMY SHALL GRANT TO THE CITY A UTILITY
 EASEMENT OVER, UNDER AND THROUGH SUCH AREA OF THE
 CAMPUS.
  
 C. PALM BEACH DAY ACADEMY SHALL SUBMIT AN APPLICATION
 TO THE ENGINEERING SERVICES DEPARTMENT FOR THE
 REALIGNMENT OF THE TUXEDO AND COCOANUT LANES AND THE
 RELOCATION OF ANY CITY UTILITIES. AFTER THE ENGINEERING
 SERVICES DEPARTMENT APPROVAL, THE PALM BEACH DAY
 ACADEMY SHALL, AT ITS OWN COST AND EXPENSE, REALIGN THE
 INTERSECTION OF TUXEDO AND COCOANUT LANES AND RELOCATE
 ANY AND ALL UTILITY LINES LOCATED WITHIN THE ABANDONED
 RIGHT-OF-WAY. THE PALM BEACH DAY ACADEMY SHALL POST A
 BOND TO THE CITY IN THE AGREED AMOUNT OF THE ESTIMATED
 COSTS ASSOCIATED WITH THE RELOCATION OF THE ROADWAY AND
 THE UTILITY LINES PRIOR TO THE RECORDATION OF THE PALM
 BEACH DAY ACADEMY PLAT.
  
 D. PALM BEACH DAY ACADEMY SHALL PROVIDE TO THE CITY A
 TEMPORARY ACCESS EASEMENT, AND TEMPORARY UTILITIES AND
 DRAINAGE EASEMENTS OVER AND ACROSS THE ABANDONED
 RIGHT-OF-WAY, IN FORM APPROVED BY THE OFFICE OF THE
 CITY ATTORNEY, AT THE TIME OF THE RECORDATION OF THE
 PALM BEACH DAY ACADEMY PLAT.
  
 E. PALM BEACH DAY ACADEMY SHALL TENDER AND DELIVER
 $11,000 TO THE CITY AS COMPENSATION FOR THE VALUE OF
 THE RIGHT-OF-WAY AND ASSOCIATED DEVELOPMENT RIGHTS.
 (PER RESOLUTION NO. 341-10)
  
 F. PALM BEACH DAY ACADEMY SHALL TENDER AND DELIVER
 $24,000 TO THE CITY AS COMPENSATION FOR THE VALUE OF
 THE RIGHT-OF-WAY AND ASSOCIATED DEVELOPMENT RIGHTS.
 (PER RESOLUTION NO. 342-10)
  
 5) THE CIVIL PLAN SUBMITTED WITH THE APPLICATION DOES
 NOT MATCH THE PLAT AND SITE PLAN FOR THE PEDESTRIAN
 EASEMENT. PLEASE NOTE THAT IT DOES SHOW THE DRAINAGE,
 UTILITY AND PEDESTRIAN EASEMENTS AND THE LANDSCAPE
 BUFFER AREA SEPARATED AS REQUIRED.
  
 6) PLEASE VERIFY WITH THE CITY SURVEYOR THE NEED FOR
 THE MAYOR AND CLERK SIGNATURE BLOCK ON THE FRONT PAGE
 OF THE PLAT.
  