| 2015-08-11 14:15:48 | CITY OF WEST PALM BEACH |
| | PUBLIC WORKS DEPARTMENT |
| | |
| | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL. |
| | |
| | 1. PLEASE SUBMIT ESTIMATES FOR THE PEAK POTABLE WATER |
| | DEMAND, SANITARY SEWER FLOW, AND SOLID WASTE COLLECTION |
| | YARDAGE. |
| | |
| | 2. PLEASE INCLUDE THE DUMPSTER ENCLOSURE DETAIL ON THE |
| | PLANS. MINIMUM DIMENSIONAL REQUIREMENTS FOR THE |
| | ENCLOSURE ARE LISTED IN CODE OF ORDINANCES, SECTION |
| | 94-444(B), ALSO SEE FIGURE XIV-3 OF THE SAME SECTION. |
| | |
| | 3. PLEASE PROVIDE AN AUTOTURN ANALYSIS DEMONSTRATING |
| | THE SOLID WASTE COLLECTION VEHICLE CAN ACCESS THE |
| | PROPOSED DUMPSTER AND COMPACTOR LOCATIONS. THE TRASH |
| | DUMPSTER/COMPACTORS MUST LOCATED IN AREAS EASILY |
| | SERVICED BY THE CITY SANITATION EQUIPMENT AND MANPOWER |
| | PER SECTION 74-35(A)(5) OF THE CODE OF ORDINANCES. |
| | |
| | 4. PRELIMINARY, UPDATED FEMA FLOOD INSURANCE MAPS ARE |
| | AVAILABLE AT HTTP://WWW.CO.PALM-BEACH.FL.US/NEWSROOM/08 |
| | 14/08-26-14-FLOOD_MAPS.HTM. PLEASE REVIEW THE MAPS AND |
| | VERIFY THAT THE NEW MAPS WILL NOT IMPACT THE PROPOSED |
| | PROJECT. |
| | |
| | 5. PLEASE SHOW A SCHEMATIC OF THE PROPOSED DRAINAGE |
| | SYSTEM ON THE SITE PLAN. (ITEM 13 ON THE SITE PLAN |
| | CHECKLIST). THE SCHEMATIC SHOULD REFLECT CONVEYANCE OF |
| | ANY OFF SITE FLOWS WHICH CURRENTLY ENTER THE SITE. |
| | |
| | 6. PLEASE REVISE THE DRIVEWAY APRONS TO MEET THE CITY?S |
| | ENGINEERING DESIGN STANDARDS. HTTP://WPB.ORG/ENGINEERIN |
| | G/ENGINEERING-SERVICES/ENGINEERING-STANDARDS/ |
| | |
| | 7 PLEASE REVISE THE LANDSCAPE PLAN TO SHOW LOCATIONS OF |
| | ALL WATER METERS, VALVES, CLEAN-OUTS, LIGHT POLES, ETC. |
| | ROOT BARRIERS MAY BE REQUIRED WHERE PLANTINGS ARE NEAR |
| | UNDERGROUND STORMWATER, SANITARY, OR POTABLE WATER |
| | LINES. |
| | |
| | 8 PLEASE SHOW THE SIGHT TRIANGLES ON THE GROUND FLOOR |
| | LANDSCAPING PLAN FOR THE INTERSECTIONS AND VEHICULAR |
| | EXITS. (SECTION 94-305E, CODE OF ORDINANCES) |
| | |
| | 9 WHAT IS THE PURPOSE OF THE PROPOSED 20 FT UTILITY |
| | EASEMENT SHOWN ON SP-1.0? |
| | |
| | 10. ON THE SITE LOCATION MAP ON SP-1.0, THE ROAD |
| | LABELED AS FEDERAL HIGHWAY IS ACTUALLY OLIVE AVENUE. |
| | ALSO ON SP-1.0, ?CLEARANCE? IS MISSPELLED ON THE NOTE |
| | WITHIN THE PUBLIC ALLEY. |
| | |
| | 11. PLEASE INCLUDE A STRIPING DETAIL SHOWING THE |
| | PROPOSED STRIPING COMPLIES WITH CITY OF WEST PALM BEACH |
| | CODE OF ORDINANCES, ARTICLE XV, SECTIONS 94-111 AND |
| | 94-485. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL |
| | BE REQUIRED FROM THE ENGINEERING DIVISION OF THE PUBLIC |
| | WORKS DEPARTMENT. THE ENGINEERING DEVELOPMENT APPROVAL |
| | APPLICATION FORMS CAN BE DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | 2. A UNITY OF TITLE APPLICATION WILL BE REQUIRED FROM |
| | THE ENGINEERING DIVISION OF THE PUBLIC WORKS |
| | DEPARTMENT. THE APPLICATION FOR UNITY OF TITLE CAN BE |
| | DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | 3. SOLID WASTE YARDAGE WILL NEED TO BE VERIFIED AS PART |
| | OF THE FINAL DESIGN TO VERIFY THAT THE DESIGN INCLUDES |
| | APPROPRIATE NUMBER AND SIZE OF TRASH BINS. |
| | |
| | 4. PLEASE IDENTIFY THE SOURCE OF THE AS-BUILT |
| | INFORMATION UTILIZED FOR THE POTABLE WATER, SANITARY |
| | SEWER, AND STORM SEWER DESIGN. |
| | |
| | 5. INDICATE ON THE PLANS WHICH PORTIONS OF THE POTABLE |
| | WATER, SANITARY SEWER, AND STORMWATER SYSTEM WILL |
| | REMAIN PUBLICALLY OWNED AND WHICH SECTIONS WILL BE |
| | MAINTAINED BY THE APPLICANT. TYPICALLY, THE CITY'S |
| | OWNERSHIP STOPS AT THE RIGHT-OF-WAY LINE UNLESS |
| | EXTENUATING CIRCUMSTANCES REQUIRED THE OWNERSHIP |
| | DIVISION TO TAKE PLACE AT ANOTHER LOCATION. |
| | |
| | 6. EASEMENTS WILL NEED TO BE PROVIDED OVER ALL ON-SITE |
| | PUBLICALLY OWNED UTILITIES. |
| | |
| | KELLY CRANFORD, P.E. |
| | LAND DEVELOPMENT ENGINEER |
| | [email protected] |
| | 561-494-1098 (OFFICE) |
| | |
| | VINCE NOEL, PSM |
| | CITY SURVEYOR / REAL ESTATE SUPERVISOR |
| | [email protected] |
| | 561-494-1096 |
| | |
| | BRIAN COLLINS, PE |
| | CITY TRAFFIC ENGINEER |
| | [email protected] |
| | 561-494-1040 |
| | |
| | FERDINAND RIVERA |
| | PUBLIC WORKS OPERATIONS MANAGER |
| | [email protected] |
| | 561-822-2076 |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | 561-494-1120 |
| | [email protected] |
| | |
| |