| 2015-08-10 15:18:30 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, |
| | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM |
| | BEACH FIRE RESCUE. |
| | |
| | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE |
| | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. |
| | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS |
| | ARE SUBMITTED FOR PERMIT. |
| | |
| | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE |
| | PROPOSED PROJECT. |
| | |
| | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY |
| | WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE |
| | PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A |
| | PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED |
| | TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN |
| | STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY |
| | MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER |
| | PROTECTION. |
| | |
| | 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY |
| | IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING |
| | ALL CONSTRUCTION ACTIVITIES. |
| | |
| | 3. THE BUILDING ADDRESS SHALL REMAIN CLEARLY VISIBLE |
| | FROM ALL ACCESS ROADWAYS, INCLUDING DURING |
| | CONSTRUCTION. ADDRESS NUMBERS SHALL CONTRAST WITH THEIR |
| | BACKGROUND AND SHALL NOT BE LESS THAN SIX (6) INCHES IN |
| | HEIGHT WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS. |
| | |
| | 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE |
| | REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE |
| | ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS. |
| | |
| | 5. THE CONSTRUCTION OF THE PROJECT SHALL COMPLY WITH |
| | THE 5TH EDITION OF THE FLORIDA FIRE PREVENTION CODE, |
| | INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES. |
| | |
| | 6. ALL EXITS SHALL BE MAINTAINED THROUGHT THE |
| | CONSTRUCTIOIN PERIOD. |
| | |
| | 7. THE AREA OF CONSTRUCTION SHALL BE FULLY SPRINKLED |
| | AND CONNECTED TO THE EXISTING SPRINKLER AND FIRE ALARM |
| | SYSTEM |
| | |
| | 8.THE FIRE AND SMOKE RATING OF THE PROPOSED |
| | CONSTRUCTION MATERIALS SHALL BE SUBMITTED WITH THE |
| | BUILDING PLAN SETS. |
| | |
| | 9. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT DOES |
| | NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. |
| | |
| | 10. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING |
| | PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH |
| | THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. |
| | |
| | |
| |