| Date |
Text |
| 2015-05-12 10:34:00 | 1. VERIFY THE 18" PIPE CONNECTING THE TWO WET RETENTION | | | AREAS ON THE WEST SIDE OF THE SITE IS OF SUFFICIENT | | | SIZE TO PROVIDE STAGE EQUALIZATION BETWEEN THE WET | | | DETENTION AREAS DURING LARGE STORM EVENTS. | | | | | | 2. THE WET DETENTION AREAS TO MEET SFWMD DIMENSIONAL | | | CRITERIA. | | | | | | 3. WHERE IS EXFILTRATION PROPOSED? IT COULD NOT BE | | | LOCATED ON THE DRAINAGE PLANS. | | | | | | 4. VERIFY THE DESIGN OF THE STORMWATER MANAGEMENT | | | SYSTEM INCLUDES RUNOFF FROM THE CITY'S PARK PARCEL. | | | | | | 5. DELETE THE HINGED MANHOLE COVER DETAILS FOR BOTH | | | STORM AND SANITARY SEWER. | | | | | | 6. PROVIDE A CROSS SECTION OF THE BERM PROPOSED IN THE | | | 50' M-CANAL EASEMENT AND SHOW THE LIMITS OF THE BERM ON | | | THE PLANS. WHO WILL BE RESPONSIBLE TO CONSTRUCT THE | | | BERM? | | | | | | 7. THE POINT OF INTERSECTION NEAR SHILOH DRIVE IS NOT | | | SHOWN FOR THE EAST BOUNDARY LINE ON THE SITE PLAN. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DIVISION | | | 561-494-1120 | | | | | 2015-05-08 13:43:51 | SEE COMMENTS UNDER PPRC ENGINEERING. |
| |
Print |
|