| Date |
Text |
| 2015-03-10 11:40:18 | PUBLIC WORKS DEPT. |
| | |
| | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | 1. PLEASE PROVIDE A COPY OF THE PHOTOMETRIC PLAN |
| | DEMONSTRATING THE PROPOSED DESIGN MEETS THE |
| | REQUIREMENTS OF CITY ORDINANCE 94-309 AND 94-113. |
| | |
| | 2. PLEASE PROVIDE A PLAN SHOWING THE ENTIRE DEVELOPMENT |
| | WITH AN AUTOTURN ANALYSIS DEMONSTRATING THE SOLID WASTE |
| | COLLECTION VEHICLE CAN ACCESS THE PROPOSED DUMPSTER |
| | LOCATION FROM THE MAIN ROADWAY. THE TRASH |
| | DUMPSTER/COMPACTORS MUST LOCATED IN AREAS EASILY |
| | SERVICED BY THE CITY SANITATION EQUIPMENT AND MANPOWER |
| | PER SECTION 74-35(A)(5) OF THE CODE OF ORDINANCES. |
| | |
| | 3. SUBMIT DEMAND, FLOW, AND YARDAGE CALCULATIONS FOR |
| | THE POTABLE WATER, SANITARY SEWER, AND SOLID WASTE |
| | COLLECTION. |
| | |
| | 4. THE PROPOSED WESTERN GREASE TRAP APPEARS TO BE |
| | OUTSIDE OF THE AREA DESCRIBED IN THE SUBMITTED WARRANTY |
| | DEED. PLEASE PROVIDE DOCUMENTATION AUTHORIZING THE |
| | CONSTRUCTION OUTSIDE OF THE OUTPARCEL BOUNDARY. |
| | |
| | 5. PLEASE SUBMIT AN APPLICATION FOR A DEVELOPMENT |
| | PERMIT TO THE ENGINEERING DEPARTMENT. APPLICATION FORMS |
| | CAN BE FOUND AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | (SECTIONS 2-421 AND 78-432, CODE OF ORDINANCES) |
| | |
| | KELLY CRANFORD, PE |
| | CITY LAND DEVELOPMENT ENGINEER |
| | [email protected] |
| | 561-494-1098 (OFFICE) |
| | |
| | VINCE NOEL, PSM |
| | CITY SURVEYOR / REAL ESTATE SUPERVISOR |
| | [email protected] |
| | 561-494-1096 |
| | |
| | BRIAN COLLINS, PE |
| | CITY TRAFFIC ENGINEER |
| | [email protected] |
| | 561-494-1040 |
| | |
| | FERDINAND RIVERA |
| | PUBLIC WORKS OPERATIONS MANAGER |
| | [email protected] |
| | 561-822-2076 |
| | |
| | TRACY WARD, PE |
| | CITY STORMWATER ENGINEER |
| | 561-494-1120 |
| | [email protected] |
| | |
| |
Print |