| Plan Review Notes For Project Z15020009 |
| Project Number |
Z15020009 |
|
| Review Stop |
ENG - PPRC |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2015-05-26 14:05:46 | PRIOR TO CONDUCTING ANY LAND DISTURBING OR LAND | | | DEVELOPMENT ACTIVITIES: | | | | | | 1. A BOND OR DEPOSIT IN AN AMOUNT COVERING THE COST | | | ASSOCIATED WITH IMPLEMENTATION OF THE STORMWATER | | | POLLUTANT PREVENTION PLAN (SWPPP) AND LAND | | | STABILIZATION OF THE SITE MUST BE SUBMITTED TO THE | | | PUBLIC WORKS DEPARTMENT. THE BOND WILL BE RELEASED UPON | | | APPROVED INSPECTION OF TIE-BEAMS OR SIMILAR VERTICAL | | | CONSTRUCTION. (CITY CODE SECTION 94-450) | | | | | | 2. ENGINEERING DEVELOPMENT APPROVAL IS REQUIRED. | | | TECHNICAL DETAILS OF THE WATER, SEWER, STORMWATER | | | (INCLUDING SWPPP), TRAFFIC CIRCULATION, AND SOLID WASTE | | | COLLECTION WILL BE REVIEWED AS PART PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL APPLICATION PROCESSES. | | | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS | | | CAN BE DOWNLOADED AT | | | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ | | | | | | KELLY CRANFORD, P.E. | | | LAND DEVELOPMENT ENGINEER | | | PUBLIC WORKS DEPARTMENT | | | CITY OF WEST PALM BEACH | | | [email protected] | | | 561-494-1098 (OFFICE) | | | |
| |
Print |
|