Plan Review Notes
Plan Review Notes For Project Z15020009
Project Number Z15020009
Review Stop ENG - PPRC
Sequence Number 3
Notes
Date Text
2015-05-26 14:05:46PRIOR TO CONDUCTING ANY LAND DISTURBING OR LAND
 DEVELOPMENT ACTIVITIES:
  
 1. A BOND OR DEPOSIT IN AN AMOUNT COVERING THE COST
 ASSOCIATED WITH IMPLEMENTATION OF THE STORMWATER
 POLLUTANT PREVENTION PLAN (SWPPP) AND LAND
 STABILIZATION OF THE SITE MUST BE SUBMITTED TO THE
 PUBLIC WORKS DEPARTMENT. THE BOND WILL BE RELEASED UPON
 APPROVED INSPECTION OF TIE-BEAMS OR SIMILAR VERTICAL
 CONSTRUCTION. (CITY CODE SECTION 94-450)
  
 2. ENGINEERING DEVELOPMENT APPROVAL IS REQUIRED.
 TECHNICAL DETAILS OF THE WATER, SEWER, STORMWATER
 (INCLUDING SWPPP), TRAFFIC CIRCULATION, AND SOLID WASTE
 COLLECTION WILL BE REVIEWED AS PART PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL APPLICATION PROCESSES.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT
 HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/
  
 KELLY CRANFORD, P.E.
 LAND DEVELOPMENT ENGINEER
 PUBLIC WORKS DEPARTMENT
 CITY OF WEST PALM BEACH
 [email protected]
 561-494-1098 (OFFICE)
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved