| 2015-02-04 09:24:41 | PUBLIC WORKS DEPT. |
| | |
| | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | 1) PLEASE SHOW ALL EXISTING EASEMENTS ON ALL OF THE |
| | SITE PLANS. |
| | |
| | 2) PLEASE PROVIDE A COPY OF THE BROWNFIELD SITE |
| | REMEDIATION AGREEMENT WITH DEP. |
| | |
| | 3) CLEARWATER WILL BE REQUIRED TO BE MILLED AND |
| | RESURFACED FROM BANYAN TO THE SOUTHERN PROPERTY LINE. |
| | |
| | 4) THE EXISTING FIRE ACCESS EASEMENT OFF OF CLEARWATER |
| | WILL NEED TO BE ABANDONED. THE NEW EMERGENCY ACCESS |
| | ROUTE WILL NEED TO BE AT LEAST 20 FEET WIDE. |
| | |
| | 5) THERE IS A FEE ASSOCIATED WITH THE PROPOSED REMOVAL |
| | OF THE METERED PARKING SPACES ALONG CLEARWATER. |
| | |
| | 6) PLEASE PROVIDE VEHICULAR AND PEDESTRIAN TRAFFIC |
| | STUDIES SHOWING HOW THE NEW SITE CONFIGURATION AND USE |
| | WILL EFFECT THE TRAFFIC VOLUME AND SURROUNDING LOCAL |
| | ROADWAYS AND WELL AS AN EVALUATION OF THE MINIMUM |
| | REQUIRED THROAT DEPTH (MRTD) NEEDED FOR EACH ON-SITE |
| | ACCESS POINT. THE RESULTS OF THE STUDY SHOULD SUPPORT |
| | TO PROPOSED MID-BLOCK PEDESTRIAN CROSSINGS AND MULTIPLE |
| | MID-BLOCK VEHICULAR STOPS. |
| | |
| | 7) REMOVE UNSIGNALIZED DOUBLE RIGHT TURN AT SOUTHERN |
| | EXIT. |
| | |
| | 8) SHOW THE APPROXIMATE LOCATIONS OF THE FOUNDATION |
| | SUPPORTS FOR THE PROPOSED NEW BUILDING(S). |
| | |
| | 9) THE EXISTING 36" WATER MAIN, WHICH CUTS THROUGH THE |
| | NORTHWEST CORNER OF PROPERTY, MUST REMAIN ACCESSIBLE |
| | FOR REPAIRS. NO CONSTRUCTION SHOULD BE PROPOSED WITHIN |
| | THE EXISTING UTILITY EASEMENT. |
| | |
| | 10) THE THREE PROPOSED PARKING SPOTS FOR BANK CUSTOMERS |
| | DO NOT APPEAR TO BE ACCESSIBLE IF DRIVE THROUGH |
| | OCCUPIED. |
| | |
| | 11) A DEVELOPER'S AGREEMENT WILL BE REQUIRED FOR ALL |
| | IMPROVEMENTS WITHIN THE RIGHT-OF-WAY. |
| | |
| | 12) THE PROPOSED POWER LINES ALONG TAMARIND MUST BE |
| | UNDERGROUND. |
| | |
| | 13) PLEASE DEMONSTRATE THAT THE PROPOSED PARKING |
| | COMPLIES WITH CITY OF WEST PALM BEACH CODE OF |
| | ORDINANCES, ARTICLE XV, SECTIONS 94-111, 94-313, AND |
| | 94-485. |
| | |
| | 14) PLEASE DEMONSTRATE THAT THE SPRAY FROM PROPOSED |
| | WATER FEATURE WILL NOT RESULT IN SLIPPERY PEDESTRIAN |
| | WALKING SURFACES. |
| | |
| | 15) HAS THE CONDITION OF THE EXISTING STORMWATER SYSTEM |
| | BEEN EVALUATED? |
| | |
| | 16) HAVE PRESSURE TESTS BEEN CONDUCTED ON THE POTABLE |
| | WATER LINE WHERE THE PROPOSED WATER, FIRE, AND |
| | IRRIGATION CONNECTIONS ARE PROPOSED? THE AVAILABLE |
| | WATER PRESSURE WITHIN THE CITY MAY NOT BE ACCEPTABLE AT |
| | ELEVATIONS HIGHER THAN THE 2ND FLOOR. WE RECOMMEND THAT |
| | A LONG-TERM PRESSURE STUDY BE PERFORMED ON THE POTABLE |
| | WATER LINES PRIOR TO FINALIZATION OF THE DESIGN. |
| | |
| | 17) THE SANITARY MANHOLE WHERE THE SANITARY SEWER |
| | CONNECTION IS PROPOSED MAY NEED TO BE REHABILITATED AS |
| | PART OF THIS PROJECT. THE LOCATION OF THE PROPOSED |
| | SANITARY CONNECTION CANNOT BE APPROVED UNTIL FLOW |
| | ESTIMATES FROM THE PROPOSED LIFT STATION ARE PROVIDED. |
| | |
| | 18) PLEASE DEMONSTRATE THAT THE PROJECT WILL PROVIDE |
| | ADEQUATE DRAINAGE AND STORMWATER MANAGEMENT. COMPLIANCE |
| | WITH CHAPTER 40E-4 WILL DEMONSTRATE COMPLIANCE WITH |
| | THIS PROVISION. |
| | APPROPRIATE MEASURES SHALL BE TAKEN TO ENSURE THAT |
| | REMOVAL OF STORMWATER WILL NOT ADVERSELY AFFECT |
| | NEIGHBORING PROPERTIES OR THE PUBLIC STORM DRAINAGE |
| | SYSTEM. [CO 94-35(C)(11)] |
| | |
| | 19) PLEASE SHOW THE LOCATIONS OF THE ROOF DRAINS AND |
| | HOW THEY WILL CONNECT TO THE STORMWATER SYSTEM. |
| | CALCULATIONS WILL NEED TO BE PROVIDED AS PART OF THE |
| | ENGINEERING DEPARTMENT DEVELOPMENT PERMIT APPLICATION. |
| | |
| | KELLY CRANFORD, PE |
| | CITY LAND DEVELOPMENT ENGINEER |
| | [email protected] |
| | 561-494-1098 (OFFICE) |
| | |
| | VINCE NOEL, PSM |
| | CITY SURVEYOR / REAL ESTATE SUPERVISOR |
| | [email protected] |
| | 561-494-1096 |
| | |
| | BRIAN COLLINS, PE |
| | CITY TRAFFIC ENGINEER |
| | [email protected] |
| | 561-494-1040 |
| | |
| |
Print |