Plan Review Notes
Plan Review Notes For Project Z14120035
Project Number Z14120035
Review Stop STORM
Sequence Number 2
Notes
Date Text
2015-02-03 17:29:151. REVISE BUILDING FFE'S ON SHEETS C1.01, C2.01 AND
 C2.02 TO BE IN REFERENCE TO NGVD.
  
 2. ON THE POLLUTION PREVENTION PLAN AND DETAILS SHEETS,
 SHOW FLOATING TURBIDITY BARRIERS IN CANAL AND PROVIDE A
 DETAIL.
  
 3. SITE PLAN COMMENTS:
 A. CONSIDER WIDENING THE SIDEWALK BETWEEN THE PARALLEL
 PARKING SPACES AND THE PARK PLACE DRIVEWAY TO CARRY THE
 BACK OF WALK OF THE DRIVEWAY SIDEWALK STRAIGHT THROUGH
 TO INTERSECT THE DEFLECTION OF THE SIDEWALK FROM BEHIND
 THE PARALLEL PARKING SPACES.
  
 B. CROSSWALK STRIPING AND STOP BAR ON PARK PLACE WILL
 NEED TO BE ADJUSTED BASED ON THE LOCATION OF THE NEW
 CURB RAMP.
  
 C. COORDINATE WITH THE ENGINEERING SERVICES DIVISION ON
 THE WIDTH AND LENGTH OF THE PAVEMENT RESTORATION ON
 PARK PLACE, EAST OF THE MEDIAN. THE TRENCH PAVEMENT
 DETAIL SPECIFIES MILLING AND RESURFACING LIMITS.
  
 D. CAN THE CURB ALONG THE BACK OF THE PARALLEL PARKING
 SPACES BE PARALLEL TO THE RIGHT-OF-WAY LINE?
  
 4. PAVING, GRADING AND DRAINAGE PLAN COMMENTS:
 A. CONFIRM GRATE ELEVATIONS FOR ONSITE DRAINAGE
 STRUCTURES. PAVEMENT CROSS SLOPES APPEAR TO BE MORE
 THAN 4% IN SOME AREAS. PROVIDE A SECTION THROUGH THE
 PARKING AREA BEHIND THE BUILDING.
  
 B. BAFFLES MAY NOT BE NEEDED IN MH BASIN #6 UNLESS IT
 HAS A GRATE RATHER THAN A SOLID COVER.
  
 C. GRADE NORTH DRIVEWAY APRON ON PARKER AVENUE TO DRAIN
 AS MUCH OF THE PAVEMENT BACK TO CB #7.
  
 D. CONSIDER CONNECTING PARK PLACE DRAINAGE SYSTEM TO
 THE EXISTING CATCH BASIN ON PARKER AVENUE AND ELIMINATE
 THE PIPE BETWEEN STRUCTURES #2 AND #3.
  
 E. PROVIDE A CROSS SECTION OF PARK PLACE THROUGH THE
 PARALLEL PARKING SPACES.
  
 5. CONCRETE DRIVEWAY APRON DETAIL SHOULD SHOW 6-FOOT
 FLARES ON EACH SIDE - 3 FEET "FLAT" AND 3 FEET OF
 FLARE. SEE CITY'S STANDARD DETAIL GC-6.
  
 6. WHICH ASPHALT PAVEMENT SECTION WILL BE SPECIFIED?
 WILL THE ONSITE PAVEMENT SECTION BE BEEFED UP FOR THE
 WHEEL LOADS OF THE FIRETRUCKS?
  
 7. THE SURVEY SHOWS THE EDGE OF WATER IN THE CANAL TO
 BE ELEVATION 9.0 FT NGVD. IT APPEARS THE LOWER PORTION
 OF ALL THREE SEGMENTS OF THE EXFILTRATION TRENCHES AND
 THE BOTTOM OF THE SLOTTED RCP PIPE IN THE SOUTH TRENCH
 WILL BE LOCATED WITHIN THE WATER TABLE.
  
 8. STORM MANHOLE DETAIL AND TYPICAL CATCH BASIN DETAIL
 SHOULD INDICATE USF240 TYPE D OR G RING AND COVER
 (OAE), DEPENDING ON LOCATION OF MANHOLE. MANHOLES
 OUTSIDE THE RIGHT-OF-WAY WILL NOT HAVE "WEST PALM
 BEACH" EMBOSSED ON THE COVER.
  
 9. CATCH BASINS GRATES SHOULD BE BICYCLE SAFE.
  
 10. VERIFY THE CIVIL DETAILS SHOWN AS "CITY OF WEST
 PALM BEACH - ENGINEERING & PUBLIC WORKS" ARE FROM THE
 CITY.
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 PUBLIC WORKS DEPARTMENT
 561-494-1120
 [email protected]
  
  
  
  