Plan Review Notes
Plan Review Notes For Project Z14120035
Project Number Z14120035
Review Stop ENG - PPRC
Sequence Number 1
Notes
Date Text
2015-01-14 07:55:49PUBLIC WORKS DEPT.
  
 THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT
 HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/
  
 1. PLEASE PROVIDE AN AUTOTURN ANALYSIS FOR THE
 SANITATION TRUCK ACCESSING THE PROPOSED DUMPSTER
 LOCATION BACKING OUT OF THE PROPOSED HANDICAPPED
 PARKING SPACE.
  
 2. PLEASE PROVIDE A COPY OF THE BOUNDARY SURVEY FOR
 THIS PARCEL.
  
 3. HOW WILL THE SANITATION TRUCKS GAIN ACCESS TO THE
 DUMPSTER ENCLOSURE? WILL THE GATES REMAIN OPEN DURING
 CERTAIN HOURS?
  
 4. PLEASE REVISE THE DRIVEWAY APRONS TO MEET THE CITY?S
 ENGINEERING DESIGN STANDARDS (GC-7). HTTP://WPB.ORG/ENG
 INEERING/ENGINEERING-SERVICES/ENGINEERING-STANDARDS/
  
 5. PLEASE SHOW THE DETECTABLE WARNING STRIPS A THE
 PROPOSED SIDEWALK RAMPS.
  
 6. CONSIDER CAPPING THE GAS LINE NEAR THE PROPERTY LINE
 RATHER THAN LEAVING IT IN PLACE UNDER THE PROPOSED
 CONSTRUCTION.
  
 7. IF A NEW TAP IS NEEDED FOR THE PROPOSED FIRE LINE,
 IT SHOULD BE MADE TO THE 8-INCH WATER MAIN ON PARK
 PLACE.
  
 KELLY CRANFORD, P.E.
 LAND DEVELOPMENT ENGINEER
 PUBLIC WORKS DEPARTMENT
 CITY OF WEST PALM BEACH
 [email protected]
 561-494-1098 (OFFICE)
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved