| Plan Review Notes For Project Z14120028 |
| Project Number |
Z14120028 |
|
| Review Stop |
ENG - PPRC |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2015-01-12 11:02:17 | PUBLIC WORKS DEPT. | | | LAND DEVELOPMENT | | | | | | THIS IS A CONCEPTUAL LEVEL REVIEW. TECHNICAL DETAILS OF | | | THE WATER, SEWER, STORMWATER, TRAFFIC CIRCULATION, | | | SOLID WASTE COLLECTION AND THE STORMWATER POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT | | | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT | | | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ | | | | | | CIVIL PLANS WERE NOT SUBMITTED FOR REVIEW. | | | | | | SHEET AE120 SHOWS AN ARROW POINTING TOWARD THE WEST | | | CONNECTING THE MIDDLE RAMP TO THE ADJACENT RAMP TO THE | | | EAST. PLEASE INDICATE THE PROPOSED GRADING FOR THIS | | | AREA. | | | | | | INDICATE THE LOCATIONS OF THE DUMPSTERS INTENDED TO BE | | | SERVICE BY THE CITY OF WEST PALM BEACH SANITATION | | | DEPARTMENT. DUMPSTERS MUST BE EASILY ACCESSIBLE BY THE | | | CITY EQUIPMENT AND MANPOWER. INCLUDE AN ESTIMATE OF THE | | | SOLID WASTE YARDAGE ANTICIPATED TO BE GENERATED BY THE | | | EXPANDED FACILITY. | | | | | | KELLY CRANFORD, P.E. | | | LAND DEVELOPMENT ENGINEER | | | PUBLIC WORKS DEPARTMENT | | | CITY OF WEST PALM BEACH | | | [email protected] | | | 561-494-1098 (OFFICE) | | | |
| |
Print |
|