| Plan Review Notes For Project Z14100025 |
| Project Number |
Z14100025 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2014-11-10 10:34:48 | 1. PROVIDE DRAINAGE CALCULATIONS DEMONSTATING EACH | | | DRAINAGE SUB-BASIN DRAINING TO EXFILTRATION TRENCH OR | | | DRY DETENTION BASIN HAS SUFFICIENT WATER QUALITY | | | TREATMENT STORAGE AND PEAK FLOW ATTENUATION. | | | | | | 2. PROVIDE DETAILS OF THE EXFILTRATION TRENCHES AND | | | CONTROL STRUCTURES. | | | | | | 3. APPARENT CONFLICT BETWEEN LIGHTPOLE AND EXFILTRATION | | | TRENCH LOCATED APPROXIMATELY 125 FEET SOUTH OF THE | | | MATCHLINE ON SHEET C3.00 | | | | | | 4. SHOW LOCATION OF R/W LINE ON FLAGLER DRIVE TYPICAL | | | SWALE SECTION ON SHEET C3.01. | | | | | | 5. CONSIDER CONSTRUCTING A BERM BETWEEN SIDEWALK AND | | | SWALE TO INCREASE STORAGE IN SWALE BEFORE SPILLING OVER | | | THE SIDEWALK. | | | | | | 6. MANHOLE/INLET SYMBOLS IN PAVING, GRADING AND | | | DRAINAGE LEGEND (SHEET C3.00) DO NOT MATCH PLAN | | | SYMBOLS. | | | | | | 7. SFWMD PERMIT TO BE OBTAINED/MODIFED BEFORE START OF | | | CONSTRUCTION. | | | | | | 8. NPDES PERMIT TO BE OBTAINED BEFORE START OF | | | CONSTRUCTION. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPT. | | | 561-494-1120 |
| |
Print |
|