Plan Review Notes
Plan Review Notes For Project Z14100024
Project Number Z14100024
Review Stop STORM
Sequence Number 1
Notes
Date Text
2014-11-10 11:49:191. CONFIRM STORM PIPES BETWEEN STRUCTURE 4.0 AND LAKE
 AND BETWEEN STRUCTURE 10.0 AND LAKE ARE TO BE
 CONSTRUCTED 23 FEET DEEP (INVERT ELEV. = -5.25). WHY SO
 DEEP?
  
 2. RECOMMEND USING MINIMUM 15" DIAMETER STORM PIPE FOR
 LONG TERM MAINTENANCE CONSIDERATION.
  
 3. SPOT GRADES CUTOFF ON LEFT SIDE OF SHEET PGD-3.
  
 4. EXPLAIN HOW DRY DETENTION AREAS WILL RECEIVE
 STORMWATER RUNOFF.
  
 5. PROVIDE TYPICAL SECTIONS FOR LAKE AND DRY DETENTION
 AREAS.
  
 6. WILL THE REAR OF PHASE 1 BUILDINGS 37-44 AND 46-52
 DRAIN TO THE PHASE 2 DRAINAGE SYSTEM?
  
 7. LABELS CUTOFF ON LEFT SIDE OF SHEET WS-3.
  
 8. CONFIRM WITH FPL THE MINIMUM CLEARANCE FOR
 CONSTRUCTING NEAR THEIR POWER POLES AND GUY WIRE
 ANCHORS.
  
 9. FAC 62-555, MINIMUM 6' HORIZONTAL SEPARATION
 REQUIRED BETWEEN OUTSIDE WATER MAINS AND SANITARY FORCE
 MAINS IS 6 FEET. IT APPEARS THE CENTER TO CENTER
 SEPARATION BETWEEN THE PROPOSED 6" FM AND 20" WATER
 MAIN IS 5 FEET AS THE FM IS DEFLECTED AROUND THE POWER
 POLES.
  
 10. PRIVATE OR PUBLIC FORCE MAIN?
  
 11. SHOW ALL PROPOSED UTILITIES ON THE PHASE 2
 LANDSCAPE PLANS. STORMWATER PIPES TO LAKE AND DRY
 DETENTION AREAS ARE NOT SHOWN.
  
 12. NO LANDSCAPING PROPOSED AROUND THE LAKE?
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING AND PUBLIC WORKS DEPT.
 561-494-1120