| 2014-12-08 08:17:27 | 1. PROJECT IS WITHIN THE NORTHERN PALM BEACH COUNTY |
| | IMPROVEMENT DISTRICT. DRAINAGE PERMIT TO BE OBTAINED |
| | FROM NPBCID PRIOR TO START OF CONSTRUCTION. |
| | |
| | 2. THE PRELIMINARY ENGINEERING PLAN, SHEET C-1, SHOWS |
| | DRAINAGE PIPES UNDER BUILDINGS 1 AND 2. THE FINAL SITE |
| | PLAN, SHEETS PHM-1 AND PHM-2, SHOW THE DRAINAGE PIPES |
| | ON THE LOT LINES. PLANS NEED TO BE COORDINATED. |
| | |
| | 3. WILL DRAINAGE EASEMENTS BE OBTAINED OVER THE |
| | PORTIONS OF THE DRAINAGE SYSTEM LOCATED OUTSIDE THE |
| | COMMON AREAS? |
| | |
| | 4. IDENTIFY WHO WILL BE RESPONSIBLE FOR OPERATION AND |
| | MAINTENANCE OF THE SURFACE WATER MANAGEMENT/DRAINAGE |
| | SYSTEM. |
| | |
| | 5. FEMA IS UPDATING THE FLOOD INSURANCE RATE MAPS |
| | (FIRM) FOR PALM BEACH COUNTY. THE PRELIMINARY FEMA |
| | FLOOD ZONES MAPS CAN BE VIEWED ON THE CITY'S GIS |
| | WEBSITE: HTTP://GIS.WPB.ORG/MAPSANDAPPS/ |
| | |
| | 6. NO GRADING PLAN PROVIDED IN THE SUBMITTAL. |
| | |
| | 7. PRIOR TO STARTING CONSTRUCITON, PROVIDE A COPY OF |
| | THE SOUTH FLORIDA WATER MANAGEMENT DISTRICT |
| | ENVIRONMENTAL RESOURCES PERMIT. |
| | |
| | 8. PRIOR TO START OF CONSTRUCTION, PROVIDE A COPY OF |
| | THE NPDES PERMIT. |
| | |
| | 9. LAND USE (PERVIOUS/IMPERVIOUS) TABLE, STORMWATER |
| | MANAGEMENT CALCULATIONS, EROSION CONTROL PLAN (SWPPP) |
| | AND PAVING, GRADING AND DRAINAGE PLANS TO BE PROVIDED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | 10. LABEL THE DRY RETENTION AREAS AS DRY DETENTION |
| | AREAS. |
| | |
| | TRACY L. WARD, P.E. |
| | SENIOR STORMWATER ENGINEER |
| | PUBLIC WORKS DEPARTMENT |
| | (561) 494-1120 |
| | |
| | |
| |