2014-09-30 12:43:25ENGINEERING/PUBLIC WORKS DEPT.
 LAND DEVELOPMENT AND STORMWATER
  
 1. POTABLE WATER, SANITARY SEWER, SOLID WASTE, AND
 STORMWATER SERVICE TO BE PROVIDED BY PALM BEACH COUNTY.
 UTILITY DESIGN AND WORK WITHIN RIGHT-OF-WAY MUST MEET
 COUNTY STANDARDS.
  
 2. INDICATE THE LOCATIONS OF THE DUMPSTERS INTENDED TO
 BE SERVICE BY THE SOLID WASTE AUTHORITY OF PALM BEACH
 COUNTY. DUMPSTERS MUST BE EASILY ACCESSIBLE BY THE SWA
 EQUIPMENT AND MANPOWER. INCLUDE AN ESTIMATE OF THE
 SOLID WASTE YARDAGE ANTICIPATED TO BE GENERATED BY THE
 FACILITY AND VERIFY THAT THE PROPOSED DUMPSTER
 ENCLOSURES WILL ACCOMODATE THE REQUIRED DUMPSTER SIZE.
 THE DUMPSTER ENCLOSURE SHOULD MEET THE CITY OF WEST
 PALM BEACH GARBAGE RECEPTACLE DETAIL. [CODE OF
 ORDINANCES, SECTION 94-444(B), FIGURE XIV-3]
  
 3. THE AVAILABLE WATER PRESSURE WITHIN THIS PORTION OF
 THE CITY MAY NOT BE ACCEPTABLE AT ELEVATIONS HIGHER
 THAN THE 2ND FLOOR. WE RECOMMEND THAT A LONG-TERM
 PRESSURE STUDY BE PERFORMED ON THE COUNTY'S POTABLE
 WATER LINES PRIOR TO FINALIZATION OF THE DESIGN.
  
 4. REVISE THE PLANS TO INDICATE WHICH PORTIONS OF THE
 POTABLE WATER, SANITARY SEWER, AND STORMWATER SYSTEM
 WILL REMAIN PUBLICALLY OWNED AND WHICH SECTIONS WILL BE
 MAINTAINED BY THE APPLICANT.
  
 5. PLEASE SHOW THE LOCATIONS OF THE ROOF DRAINS AND
 INDICATE WHERE THE RUNOFF FROM THE ROOF DRAINS WILL BE
 DIRECTED. THE ROOF DRAIN PEAK DISCHARGE RATE AND
 VELOCITY WILL NEED TO BE INCLUDED IN THE FINAL DESIGN
 OF THE STORMWATER MANAGEMENT SYSTEM.
  
 KELLY CRANFORD, P.E.
 LAND DEVELOPMENT ENGINEER
 ENGINEERING & PUBLIC WORKS DEPARTMENT
 CITY OF WEST PALM BEACH
 [email protected]
 561-494-1098 (OFFICE)
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved