| Plan Review Notes For Project Z14080021 |
| Project Number |
Z14080021 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2014-09-10 11:14:32 | 1. INDICATE ON THE EROSION CONTROL PLAN THE LOCATION OF | | | THE TRUCK RUBBLE STRIP. | | | 2. SUBMIT WITH ENGINEERING PERMIT APPLICATION | | | MODIFICATION TO THE SFWMD ERP PERMIT. | | | 3. BEFORE CONSTRUCTION BEGINS, PROVIDE COPY OF FDEP | | | NPDES STORMWATER CONSTRUCTION PERMIT. | | | 4. VERIFY VERTICAL DATUM ON PGD PLAN. | | | 5. CONGRESS AVENUE MAY BE STATE OR COUNTY MAINTAINED. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | (561) 494-1120 | | | |
| |
Print |
|