| Plan Review Notes For Project Z14080019 |
| Project Number |
Z14080019 |
|
| Review Stop |
STORM |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2014-12-19 17:05:44 | 1. NOTE 4 ON SHEET C5.01 LISTS NAVD88. | | | | | | 2. DRIVEWAY ON FLAGLER DRIVE AT SW CORNER OF SITE IS | | | SHOWN TO GET NEW VALLEY GUTTER INSTEAD OF REPLACEMENT | | | OF CURB WITH TYPE 'F' CURB AND GUTTER AND THE REMOVAL | | | OF THE DRIVEWAY APRON BETWEEN THE CURB AND SIDEWALK. | | | THIS WORK SHOULD ALSO BE SHOWN ON THE DEMOLOTION PLAN | | | FOR CONTINUITY. | | | | | | 3. PRIOPOSED STORM MISSING FROM THE LIGHTING AND | | | PHOTOMETRICS PLANS. | | | | | | 4. THERE IS NOT ANY "CONTROLS" IN STRUCTURE S-10 TO | | | REGULATE STORMWATER RUNOFF INTO THE EXFILTRATION | | | TRENCH. IT APPEARS EXFILTRATION TRENCH WILL BE | | | SURCHARGED ONLY WHEN THE RETENTION AREA FILLS UP. | | | | | | 5. SWPPP SHOULD INCLUDE PROTECTION OF INLETS ON FLAGLER | | | DRIVE. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | PUBLIC WORKS DEPARTMENT | | | 561-494-1120 |
| |
Print |
|