2014-07-10 11:55:35** FAILED **
  
 * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 * WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF TEN
 (10) COPIES, ONE (1) REDUCED COPY (8 1/2 BY 11), AND AN
 ELECTRONIC COPY IN .PNG FORMAT OF ALL PLANS. PLEASE
 NOTE THAT RE-SUBMITTALS MAY BE SUBJECT TO ADDITIONAL
 COMMENTS.
  
 * PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20 PERCENT ($200) OF THE ORIGINAL APPLICATION
 FEE.
  
  
 GENERAL COMMENTS:
  
 1.) SUBMIT A LETTER FROM COMCAST CONFIRMING THE
 PROPOSED PROJECT DOES NOT ENCROACH INTO THEIR EASEMENTS
 OR OTHERWISE INTERFERE WITH THE PROVISIONS OF THEIR
 SERVICES. (REPEAT COMMENT FROM 6/11/14: A LETTER FROM
 COMCAST IS REQUIRED. THERE CANNOT BE ANY ASSUMPTIONS.
 PLEASE FOLLOW-UP WITH COMCAST ON THE STATUS.).
  
  
 SITE PLAN:
  
 1.) FDOT APPROVAL IS REQUIRED FOR THE ON STREET PARKING
 AND STRIPING ALONG SOUTH DIXIE HIGHWAY. (REPEAT COMMENT
 FROM 6/11/14: THE APPLICANT IS AWARE OF THIS
 REQUIREMENT. AS INDICATED IN THE RESPONSE LETTER, A
 LETTER FROM FDOT IS FORTHCOMING.)
  
  
 2.) PLEASE UPDATE THE NOTE REGARDING THE DUMPSTER IN
 THE "NOTES" SECTION IN SHEET SP-1.
  
  
 LANDSCAPE PLAN:
  
 1.) THE QUANTITIES OF MONTGOMERY PALMS (VM3),
 BOUGAINVILLEA (BS1) AND BLUE RUG JUNIPER (JBR) DOES NOT
 MATCH THE QUANTITIES PROVIDED IN THE PLAN. PLEASE
 ADDRESS.
  
 2.) THE AMOUNT OF OPEN SPACE PROVIDED (PER THE
 DEFINITION IN S.94-611 OF THE ZLDR) IS 6,575 SQ. FT.
 AND NOT 4,620 SQ. FT. PLEASE ADDRESS IN THE OVERALL
 LANDSCAPING REQUIREMENT TABLE IN SHEET LP-1.
  
  
 SIGNAGE:
  
 1.) THE MAXIMUM SUM TOTAL AREA OF THE FREESTANDING SIGN
 CANNOT EXCEED 100 SQ. FT. (PROPOSED DOUBLE-SIDED SIGN:
 100 SQ. FT./SIDE X 2 = 200 SQ. FT.) PLEASE ADDRESS.
 (ZLDR S.94-408(A)(2)B.)
  
 2.) THE FREESTANDING SIGN SHALL BE SETBACK 5 FT. FROM
 THE FRONT PROPERTY LINE. (ZLDR S.94-408(2) E.1.)
  
 3.) THE MONUMENT SIGN IS NOT SCALED CORRECTLY IN THE
 SITE AND LANDSCAPE PLANS PER THE SIGN DETAIL. PLEASE
 ADDRESS FOR CONSISTENCY.
  
  
  
  
  
  