| Plan Review Notes For Project Z14040016 |
| Project Number |
Z14040016 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2014-05-08 16:13:39 | 1. SHOW VERTICAL DATUM ON THE ENGINEERING PLAN. | | | 2. MODIFY SFWMD ERP PERMIT BEFORE START OF | | | CONSTRUCTION. | | | 3. OBTAIN NPDES STORMWATER CONSTRUCTION PERMIT PRIOR TO | | | START OF CONSTRUCTION. | | | 4. SUBMIT WITH THE ENGINEERING PERMIT APPLICATION | | | DRAINAGE CALCULATIONS; PAVING, GRADING AND DRAINAGE | | | PLANS; AND EROSION CONTROL PLAN. | | | 5. HANDICAP PARKING NEEDED FOR PHASE 1? | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | 561-494-1120 |
| |
Print |
|