| Date |
Text |
| 2014-07-14 16:29:22 | RESPONSES TO COMMENTS FROM PREVIOUS REVIEW: |
| | 3. INFORMATION REGADING COMPLIANCE WITH PRIVATE OPEN |
| | SPACE REQUIREMENTS PROVIDED IN LA DRAWINGS IS NOT |
| | SUFFICIENT. PLEASE INDICATE COMPLIANCE FOR EACH OF THE |
| | PARCELS REGARDING THE AMOUNT OF PUBLIC OPEN SPACE |
| | REQUIRED, PRIVATE OPEN SPACE REQUIRED, PERCENTAGE OF |
| | VEGETATED AREA REQUIRED, AND PERCENTAGE OF TREE CANOPY |
| | ACCORDING TO TABLE IV-7 AND IV-8. TABLE SHALL ALSO |
| | INCLUDE CALCULATIONS FOR THE PUBLIC OPEN SPACE |
| | REQUIRED. |
| | 4. ADDITIONAL INFORMATION REGARDING PROPOSED BRIDGE IS |
| | MISSING. FLOOR PLANS FOR 3RD, 4RD AND 5TH FLOOR MISSING |
| | FROM PACKET. IS THE BRIDGE IS ONLYY CONNECTING THE TWO |
| | ROOFTOP GARDENS? SECTION ON SHEET A8 SHOWS A PORTION OF |
| | A BRIDGE ALSO ON 5TH FLOOR. |
| | 8. GROSS SQUARE FOOTAGE CALCULATIONS PROVIDED SEEM NOT |
| | TO INCLUDE A PORTION OF THE LOBBLY ON CLEMATIS STREET. |
| | PLEASE CLARIFY THE USE OF AREA EXCLUDED AROUND THE |
| | ELEVATOR ON THE 11TH FOOR, CORRIDORS LEADING TO |
| | MECHANICAL ROOMS SHALL BE INCLUDED IN THE FAR. IN |
| | GENERAL, PLEASE CONFIRM THE GROSS BUILDING AREA FOR ALL |
| | THE FLOOR. A ROUGH ESTIMATE OF THE FIRST FLOOR |
| | CALCULATED BY STAF FRESULTS IN 14,830SF VS 12,690SF |
| | INDICATED IN SHEET A-14 FOR THE CLEMATIS STREET |
| | BUILDING. |
| | SCHOOL BOARD APPROVAL IS FOR 166 UNITS, AND THE PROJECT |
| | CURRENTLY PROPOSED 168, PLEASE OBTAIN REVISED APPROVAL. |
| | 10. ELEVATIONS PROVIDED AR BLACK AND WHITE AND IT IS |
| | VERY DIFFICULT TO READ THE ARCHITECTURAL DESIGN. PLEASE |
| | PROVIDE COLORED ELEVATIONS WITH SHADOWS TO BETTER ALLOW |
| | THE BUILDING ELEVATION REVIEW. THEY COULD BE RPOVIDED |
| | AT 11 BY 17 SIZE. |
| | 13. PLEASE PROVIDE BACK UP INFORMATION TO CONFIRM |
| | COMPLIANCE WITH TABLE IV-4: FACADE ARTICULATION |
| | REQUIREMENTS. COMPLIANCE WITH PLANAR BREAK AND BLANK |
| | WALL WILL BE REQUIRED BETWEEN OTHERS INCLUDED IN |
| | TABLE.WHAT IS THE PROPOSED TREATMENT FOR THE WALL |
| | ADJACENT TO FPL? |
| | 14. AUTO TURN ANALYSIS WAS NOT INCLUDED WITH |
| | RESUBMITTAL. |
| | 17. FOUNTAIN INDICATED AS REMOVED IN RESPONSE LETTER IS |
| | STILL SHOWN IN LA AND SITE PLAN DRAWINGS. IT SHALL BE |
| | REMOVED OR MOVED CLOSER TO THE BUILDING AS IT BLOCKS |
| | PEDESTRIAN TRAFFIC. |
| | 18. TREE GRATES ALONG DATURA SHALL BE LOCATED ADJACENT |
| | TO THE CURB. |
| | 25. PLEASE INCLUDE DIMENSIONS IN ALL PARKING SPACES TO |
| | DEMONSTRATE COMPLIANCE. |
| | |
| | ADDITIONAL COMMENTS FRO 2ND REVIEW |
| | 1. PARKING ON NORTH SIDE OF ALLEY REQUIRES A 5 FEET |
| | LANDSCAPE BUFFER. ONE ALTERNATIVE IS TO RELOCATE THE |
| | PARKING AS 90 DEGREE BACKING UP ON THE ALLEY (BACK UP |
| | WIDTH SHALL BE MIN. 24'). |
| | 2. TREE GRATES ALONG DATURA STREET SHALL BE LOCATED |
| | ADJACENT TO THE BACK OF CURB. |
| | 3. ENTIRE SIDEWALK WIDTH ALONG DATURA STREET SHALL BE |
| | CONCRETE. |
| | 4. A TRANSITIONAL PAVER DESIGN SHALL BE DONE AT |
| | CLEMATIS AND ROSEMARY, AND ROSEMARY AND DATURA. FURTHER |
| | DISCUSSION NEEDED. |
| | 5. PROPOSED CURB CUT ON DATURA ST. EXCEED MAXIMUM CURB |
| | CUT ALLOWED. MAXIMUM PERMITTED IS 25'. |
| | 6. DUE TO THE PROPOSED RAMP SLOPE A BREAK OVER |
| | TRANSITION IS REQUIRED. |
| | 7. PARKING RAMP CANNOT START WITHIN THE MINIMUM |
| | REQUIRED SETBACK. |
| | 8. BIKE RACK SHALL FOLLOW CITY STANDARD. |
| | 9. ALL MECHANICAL EQUIPMENT IN ROOF SHALL BE ENCLOSED |
| | AND SCREENED. |
| | 10. PLEASE DIMENSION ALL PARKING SPACES INSIDE GARAGE. |
| | 11. ALL SETBACKS ARE MEASURED FROM THE BACK OF CURB, |
| | NOT THE FACE OF CURB. |
| | 12. PLEASE PROVIDE COLORED ELEVATIONS, PREFERABLY WITH |
| | SHADOWS. BLACK AND WHITE COPIES ARE REALLY DIFFICULT TO |
| | READ. PRINTED COLORED ELEVATIONS CAN BE 11 BY 17. |
| | 13.PLEASE INCLUDE A STRUCTURAL SOIL DETAIL FOR ALL |
| | AREAS AROUND TREE GRATES (10' AROUND TREE UNDER |
| | SIDEWALK). |
| | 14. PLEASE STUDY THE POSIBILITY TO RELOCATE THE WATER |
| | METER AND RPZ TO THE ALLEY FRONTAGE. |
| | 15. PLEASE PROVIDE INFORMATION TO CONFIRM COMPLIANCE |
| | WITH ALL BUILDING REQUIREMENT ELEMENTS FOR EACH PARCEL |
| | (FOOTPRINT). |
| | 16. DROP-OFF AREA ON CLEMATIS STREET IS NOT PERMITTED, |
| | SPACE SHALL BE MAINTAINED AS ON-STREET PARKING. |
| | 17. PLEASE PROVIDE DOCUMENTATION FOR SANITATION |
| | APPROVAL ON TRASH COLECTION LOCATION. |
| | 18. PLEASE PROVIDE A TABLE WITH ALL UNIT SIZE TO |
| | CONFIRM COMPLIANCE WITH MINIMUM UNIT SIZE AND AVERAGE |
| | UNIT SIZE REQUIRED. |
| | 19. FLOOR PLANS FOR LEVEL 3, 4, AND 5 ARE MISSING FROM |
| | DRAWING SET. |
| | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA |
| | APONTE AT 561-822-1439. |
| |
Print |