| Date |
Text |
| 2014-11-10 08:58:24 | ENGINEERING/PULBLIX WORKS DEPT. |
| | LAND DEVELOPMENT |
| | |
| | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION DETAILS |
| | WILL BE REVIEWED AS PART OF THE ENGINEERING DEVELOPMENT |
| | APPROVAL AND BUILDING PERMIT APPLICATION PROCESSES. |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL. |
| | |
| | 1. ON SHEETS C1 AND C2, CHANGE NOTES 4 AND 1 TO READ |
| | "ALLEYWAY SHALL BE RECONSTRUCTED TO MEET CITY OF WEST |
| | PALM BEACH STANDARDS." |
| | |
| | 2. AFTER INSPECTING THE EXISITING SANITARY LINES, WE |
| | HAVE FOUND THE SANITARY LINE IN THE ALLEY TO BE IN POOR |
| | CONDITION. PLEASE REVISE THE DESIGN TO TIE INTO THE |
| | MAIN ALONG ROSEMARY. |
| | |
| | 3.VERIFY THE SOUTHERN PARKING GARAGE RAMP SLOPE BETWEEN |
| | THE GROUND AND 2ND FLOORS. THE RAMP IS MARKED WITH A 6% |
| | SLOPE, BUT THE ELEVATIONS INDICATE THE RAMP CLIMBS FROM |
| | 3 TO 14 FEET OVER THE 84 FT LENGTH OF THE RAMP. |
| | |
| | 4. THE PROPOSED FLOOD PROTECTION FOR THE SOUTHERN |
| | PARKING GARAGE IS A PUMP. SHOW HOW THE ANY WATER |
| | COLLECTED IN THIS AREA IS GOING TO BE TREATED PRIOR TO |
| | DISCHARGE AND WHERE THE TREATED WATER WILL BE |
| | DISCHARGED. |
| | |
| | 5. THE PROPOSED LAYOUT IS NOT ACCESSIBLE TO THE SOLID |
| | WASTE TRUCKS (35 FT LONG, 15 FT HIGH). THE PROPOSAL TO |
| | ROLL THE TRASH BINS INTO THE ALLEY WILL IMPEDE TRAFFIC |
| | FLOW WHILE THE BINS ARE IN THE ALLEY AND COMPLETELY |
| | BLOCK TRAFFIC WHEN THE SOLID WASTE TRUCKS ARE |
| | COLLECTING THE GARBAGE. REVISE THE DESIGN TO |
| | ACCOMMODATE THE TRUCKS WITHOUT REQUIRING THEM TO BACK |
| | AROUND CORNERS OR DOWN THE ALLEY AND TO COMPLY WITH |
| | SECTION 74-35(A)(9) OF THE CODE OF ORDINANCES. |
| | |
| | 6. VERIFY THAT THE PROPOSED SIZE AND QUANTITY OF TRASH |
| | BINS IS APPROPRIATE FOR THE WASTE YARDAGE ANTICIPATED |
| | TO BE GENERATED BY THE COMPLEX. CONSIDER USING A |
| | COMPACTOR TO REDUCE THE YARDAGE OF WASTE THAT WILL NEED |
| | TO BE COLLECTED. |
| | |
| | 7. PROVIDE VERTICAL PROFILES FOR THE PARKING GARAGE |
| | RAMPS INCLUDING THE TRANSITION AREA GEOMETRY. |
| | |
| | KELLY CRANFORD, P.E. |
| | LAND DEVELOPMENT ENGINEER |
| | PUBLIC WORKS DEPARTMENT |
| | CITY OF WEST PALM BEACH |
| | [email protected] |
| | 561-494-1098 (OFFICE) |
| | |
| |
Print |