Plan Review Notes
Plan Review Notes For Project Z14030060
Project Number Z14030060
Review Stop SURVEY
Sequence Number 1
Notes
Date Text
2014-04-04 10:34:131. REPLAT WIL BE REQUIRED. APPLICATION IS MADE THROUGH
 ENGINEERING SERVICES FOR TECHNICAL REVIEW.
 2. REVISE SURVEY TO INCLUDE WEST ONE-HALF OF LOT 5.
 3. RIGHT-OF-WAY DEDICATION WILL BE REQUIRED FOR A
 PORTION OF DATURA ST.
 4. PRIVATE DRAINAGE CROSSING ALLEY WILL REQUIRE
 AGREEMENT.
 5. KEEP SANITARY CONNECTIONS OUT OF ALLEY.
 6. PROVIDE JUSTIFICATION FOR ABANDONMENT OF 6" WATER
 MAIN.
 7. SITE/CIVIL PLANS REQUIRE SEPARATE SUBMITTAL TO
 ENGINEERING SERVICES.
 8. BRIDGE CROSSING ALLEY WILL REQUIRE A SEPARATE
 AGREEMENT/PERMIT.
 9. SITE PLAN DOES NOT SHOW ADDITIONAL R/W PER
 MAINTENANCE MAP FOR WEST 1/2 OF LOT 5. DOORS CANNOT
 OPEN INTO RIGHT-OF-WAY.
 10. IS ADDITIONAL ALLYE WIDTH TO BE DEDICATED AS R/W?
 11. BRIDGE NOT SHOWN ON SHEET A-6, BUILDING SECTION.
 ADD RIGHT-OF-WAY LINES TOSECTION AND ELEVATIONS.
 12. APPROVAL OF SANITATION SUPERVISOR, FERDINAND
 RIVERA, WILL BE REQUIRED.
 13 PROPERTY CORNERS MISSING ALONG EAST LINE OF LOT 4.