| Plan Review Notes For Project Z14030060 |
| Project Number |
Z14030060 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2014-04-04 13:57:14 | 1. INCLUDE WITH THE ENGINEERING PERMIT APPLICATION THE | | | FOLLOWING: | | | - SIGNED AND SEALED DRAINAGE CALCULATIONS AND LAND USE | | | BREAKDOWN (PERVIOUS/IMPERVIOUS/BUILDING/ETC.) | | | - SIGNED AND SEALED ENGINEERING PLANS INCLUDING PAVING, | | | GRADING AND DRAINAGE PLAN AND AN EROSION CONTROL PLAN | | | 2. BEFORE START OF CONSTRUCTION, PROVIDE FDEP NPDES | | | PERMIT | | | 3. WEIR BOX DETAIL SHOWS HEIGHT TO BE PIPE DIAMETER + | | | 6". BASED ON EXFILTRATION TRENCH DESIGN, THE HEIGHT | | | SHOULD BE PIPE DIAMETER + 18" (6" BELOW AND 12" ABOVE | | | THE PIPE). | | | 4. INCLUDE BAFFLES IN INLETS CONNECTED TO EXFILTRATION | | | TRENCHES. | | | 5. WILL THE OVERHEAD ELECTRIC LINES IN THE ALLEY BE | | | AFFECTED? | | | 6. SHOW PROPERTY LINES ON THE BUILDING SECTION SHEET | | | A-6. | | | 7. WHERE IS THE ALLEY EXFILTRATION TRENCH IN RELATION | | | TO THE SUBTERRANEAN PARKING AREAS? | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | 561-494-1120 |
| |
Print |
|