| Plan Review Notes For Project Z14030056 |
| Project Number |
Z14030056 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2014-04-04 11:47:33 | 1. CROSS SLOPE OF WALKWAY SHOULD DRAIN TO INTERIOR OF | | | SITE AND NOT TOWARD THE INTRACOASTAL WATERWAY. | | | 2. WILL THE PROPOSED CONTROL STRUCTURE BE LOCATED | | | WITHIN THE WALKWAY? | | | 3. SHOW UTILITIES ON THE LANDSCAPE PLANS. | | | 4. PROVIDE WATER QUALITY TREATMENT FOR STORMWATER | | | RUNOFF PER SFWMD VOLUME CRITERIA. | | | 5. INCLUDE WITH THE ENGINEERING PERMIT APPLICATION THE | | | FOLLOWING: | | | - SIGNED AND SEALED DRAINAGE CALCULATIONS AND LAND USE | | | BREAKDOWN (PERVIOUS/IMPERVIOUS/BUILDING/ETC.) | | | - SIGNED AND SEALED ENGINEERING PLANS INCLUDING PAVING, | | | GRADING AND DRAINAGE PLAN AND AN EROSION CONTROL PLAN | | | 6. PROVIDE BEFORE START OF CONSTRUCTION THE FOLLOWING | | | PERMITS: | | | - SFWMD ERP | | | - FDEP NPDES | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | 561-494-1120 | | | |
| |
Print |
|