| 2014-04-04 11:17:54 | 1. SHEET C-02: |
| | - REMOVE REFERENCE TO DADE COUNTY |
| | - CHANGE REFERENCES TO WEST PALM BEACH COUNTY TO EITHER |
| | CITY OF WEST PALM BEACH OR PALM BEACH COUNTY, AS |
| | APPLICABLE. |
| | - SEPARATION STATEMENT APPEARS TO REFER TO OLD STANDARD |
| | 2. GENERAL NOTE 1 - ATTACHED SURVEY HAS A REVISION DATE |
| | OF 11/6/13. |
| | 3. IF AVAILABLE, PROVIDE INFORMATION ON THE DISCHARGE |
| | POINT OF THE FORCE MAIN FROM THE LIFT STATION IN THE |
| | WEST REAR OF THE SHOPPING CENTER. |
| | 4. THERE APPEAR TO BE SEVERAL LIGHT POLES ENCROACHING |
| | INTO PARKING SPACES, INCLUDING A LIGHT POLE THAT WILL |
| | HAVE A LANDSCAPE ISLAND SURROUNDING MOST OF THE POLE. |
| | CAN THE LANDSCAPE ISLAND BE ENLARGED TO FULLY ENCOMPASS |
| | THE LIGHT POLE? |
| | 5. THE ENDS OF TWO PROPOSED PARKING SPACES IN THE SOUTH |
| | END OF THE SECOND ROW OF PARKING ARE UNPROTECTED BY THE |
| | PROPOSED LANDSCAPE ISLANDS. |
| | 6. INDICATE ON THE PGD PLAN THE MINIMUM HORIZONTAL |
| | SEPARATION DISTANCE REQUIRED FOR THE PROPOSED STORM |
| | STRUCTURES AND EXISTING WATER MAIN IN THE REAR OF THE |
| | PROPOSED BUILDING. |
| | 7. DO THE PROPOSED PARKING LOT GRADES TAKE INTO |
| | CONSIDERATION THE ASPHALT OVERLAY? |
| | 8. PROVIDE WATER QUALITY TREATMENT FOR STORMWATER |
| | RUNOFF MEETING SFWMD VOLUME REQUIREMENTS. |
| | 9. SFWMD PERMIT OR NO-NOTICE LETTER MAY BE REQUIRED |
| | BEFORE START OF CONSTRUCTION. |
| | 10. COPY OF FDEP NPDES PERMIT TO BE PROVIDED BEFORE |
| | START OF CONSTRUCTION. |
| | 11. BELVEDERE ROAD IS MAINTAINED BY PALM BEACH COUNTY. |
| | PROVIDE A LETTER FROM THE COUNTY RIGHT-OF-WAY AND |
| | DRAINAGE SECTIONS INDICATING NO OBJECTIONS TO THE |
| | PROPOSED CHANGES TO THE DRAINAGE SYSTEM DISCHARGING TO |
| | THE BELVEDERE DRAINAGE SYSTEM AND THE DRIVEWAY |
| | CONNECTIONS TO BELVEDERE. |
| | 12. CONSTRUCTION OF THE MONCEAUX ROAD GROUP 1 DRAINAGE |
| | AND UTILITY IMPROVEMENT PROJECT WILL BEGIN IN MAY 2014 |
| | AND LAST APPROXIMATELY ONE YEAR. THIS PROJECT WILL |
| | REPLACE UTILITIES AND RECONSTRUCT THE ROAD ON GEORGIA |
| | AVE FROM BELVEDERE ROAD TO HAMPTON ROAD. |
| | |
| | TRACY L. WARD, P.E. |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING AND PUBLIC WORKS DEPARTMENT |
| | 561-494-1120 |
| |