| Plan Review Notes For Project Z14010020 |
| Project Number |
Z14010020 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2014-01-30 18:51:27 | 1. SITE IS TO RETAIN STORMWATER RUNOFF MEETING SFWMD | | | CRITERIA AND OBTAIN PERMITS FROM THE PROPER DRAINAGE | | | DISTRICT TO DISCHARGE STORMWATER INTO THEIR SYSTEM. | | | 2. REMOVE DRIVEWAY CONNECTION WHERE THE POOL IS | | | LOCATED. REPLACE WITH TYPE' F; CURB AND CONCRETE | | | SIDEWALK. | | | 3. PROVIDE COPY OF SFWMD ERP PERMIT BEFORE START OF | | | CONSTRUCTION. | | | 4. PROVIDE COPY OF FDEP CONSTRUCTION NPDES PERMIT | | | BEFORE START OF CONSTRUCTION. | | | 5. PROVIDE STORMWATER MANAGEMENT CALCULATIONS AND | | | PERVIOUS/IMPERVIOUS INFORMATION WITH ENGINEERING PERMIT | | | APPLICATION. | | | 6. IF PAVERS ARE ALLOWED IN THE ALLEY AND IN N. OLIVE | | | AVE RIGHT-OF-WAY, PROPERTY OWNER TO BE RESPONSIBLE TO | | | MAINTAIN THE PAVERS AND HEADER CURBS. | | | 7. SHOW UTILITIES ON THE LANDSCAPE PLANS. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | 561-494-1120 |
| |
Print |
|