| Plan Review Notes For Project Z14010013 |
| Project Number |
Z14010013 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2014-01-30 19:15:12 | 1. SITE PLAN (SHEET A100) MISSING NORTH ARROW. | | | 2. SURVEY NOT SIGNED AND SEALED. | | | 3. NO ENGINEERING PLANS PROVIDED. | | | 4. CITY VERTICAL DATUM IS NGVD 1929. | | | 5. COPY OF SFWMD PERMIT TO BE PROVIDED BEFORE START OF | | | CONSTRUCTION. | | | 6. COPY OF FDEP CONSTRUCTION NPDES PERMIT TO BE | | | PROVIDED BEFORE START OF CONSTRUCTION. | | | 7. SITE TO RETAIN STORMWATER RUNOFF PER SFWMD CRITERIA. | | | 8. SWPPP AND EROSION CONTROL PLAN TO BE PROVIDED WITH | | | ENGINEERING PERMIT APPLICATION. | | | 9. STORMWATER DRAINAGE AND IMPERVIOUS/PERVIOUS | | | CALCULATIONS TO BE PROVIDED WITH ENGINEERING PERMIT | | | APPLICATION. | | | 10. STORM PIPE IN ALLEY MAY NEED TO BE REPLACED AS PART | | | OF THIS PROJECT. | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | 561-494-1120 |
| |
Print |
|