| 2014-01-03 15:41:32 | 1. PROVIDE COPY OF SFWMD ERP PERMIT BEFORE START OF |
| | CONSTRUCTION. |
| | 2. PROVIDE COPY OF LWDD DRAINAGE PERMIT BEFORE START OF |
| | CONSTRUCTION. |
| | 3. PROVIDE COPY OF NPDES NOI BEFORE START OF |
| | CONSTRUCTION. |
| | 4. PROVIDE SWPPP AND PGD PLANS WITH ENGINEERING PERMIT |
| | APPLICATION. |
| | 5. PROVIDE SIGNED AND SEALED DRAINAGE CALCULATIONS WITH |
| | ENGINEERING PERMIT APPLICATION. |
| | 6. CAR WASH WATERS SHOULD BE PREVENTED FROM ENTERING |
| | THE DRAINAGE SYSTEM. |
| | 7. AVOID PLANTING OF TREES WITHIN 5 FEET OF UNDERGROUND |
| | UTILITIES. |
| | 8. WHERE DOES THE EXISTING CATCH BASIN AT THE SOUTHWEST |
| | CORNER OF THE SITE DRAIN TO. |
| | 9. SITE PLAN SHOWS WHEEL STOPS IN THE 90-DEGREE PARKING |
| | SPACES NORTH OF DETAIL BAYS. CONCEPTUAL ENGINEERIING |
| | PLAN DOES NOT. |
| | 10. SHOW CURB AND/OR WHEEL STOP IN PARKING AND STRIPING |
| | DETAIL ON SHEET SP-2 OF 2. |
| | 11. HOW DOES HANDICAP PARKING PATRON ACCESS THE MAIN |
| | OFFICE? IS CURB RAMP NEEDED AT EAST END OF PARKING |
| | STALL? |
| | 12. CORRECT LEADER FOR SIDEWALK RAMP IN ACCORDANCE WITH |
| | FDOT STND. INDEX#304. IT POINTS TO SIDEWALK AT EAST |
| | PROPERTY LINE. |
| | 13. DOES INGRESS DRIVE NEED TO BE 24-FEET WIDE. |
| | 14. NO CURBING SHOWN ALONG THE EAST SIDE OF THE COVERED |
| | LOADING AREA. |
| | 15. SHOW CROSS WALK STRIPING AND SIDEWALK AT NORTH END |
| | OF SITE ON THE CONCEPTUAL ENGINEERING PLAN AS IT IS |
| | SHOWN ON THE SITE PLAN. WILL THE SIDEWALK CONNECT TO |
| | THE SIDEWALK ALONG OKEECHOBEE BLVD.? IS THIS THE ADA |
| | ACCESSIBLE ROUTE FROM PUBLIC R/W? |
| | |
| | TRACY L. WARD, P.E. |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING AND PUBLIC WORKS DEPARTMENT |
| | 561-494-1120 |
| | |
| |