Plan Review Notes
Plan Review Notes For Project Z13110009
Project Number Z13110009
Review Stop TRAFFIC
Sequence Number 1
Notes
Date Text
2013-12-11 11:55:041. NEED TO SEE HOW THE SHARED DRIVEWAY WITH WATERVIEW
 TOWERS WORKS - SIGNING AND STRIPING.
 2. NEED LOCAL AREA TRAFFIC IMPACT STUDY IN ADDITION TO
 CONCURRENCY STUDY.
 3. BANYAN IS MAIN ROUTE OUT OF DOWNTOWN, YET STUDY ONLY
 ASSIGNS 5% OF TRAFFIC TO BANYAN. NEED TO RE-VISIT
 TRAFFIC ASSUMPTIONS.
 4. IF VALET PICKS UP VEHICLES AT HOTEL DROP-OFF VIA
 SOUTH DRIVEWAY AND PARKS IN GARAGE VIA NORTH DRIVEWAY,
 THEN TRAFFIC STUDY NEEDS TO INCLUDE THESE ADDITIONAL
 TRIPS.
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved