| Plan Review Notes For Project Z13110009 |
| Project Number |
Z13110009 |
|
| Review Stop |
SURVEY |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2013-12-10 11:00:11 | 1. ADD VERTICAL DATUM NOTE AND BENCHMARK INFORMATION TO | | | SURVEY. LINE TABLE IS MISSING. | | | 2. ADD BOUNDARY LINES TO SITE PLAN AND GROUND FLOOR | | | PLAN. ADD STMH'S TO AS-BUILT TABLE. | | | 3. TWO COMPACTOR AREAS ON GROUND FLOOR PLAN ARE NOTED | | | AS LOADING ON SITE PLAN | | | 4. PROPOSED GARBAGE COLLECTION WILL NEED APPROVAL OF | | | FERDINAND RIVERA, SANITATION SUPERINTENDENT. | | | 5. PROPOSED LANDSCAPING WILL CONFLICT WITH THE PROPOSED | | | RELOCATION OF THE SANITARY SEWER SYSTEM. | | | 6. IT APPEARS SOME IMPROVEMENTS WILL ENCROACH INTO THE | | | COMMERCIAL UNIT C-1 AS WELL AS INGRESS AND EGRESS. | | | 7. THE EXISTING POOL AND DECKING APPEARS TO CONFLICT | | | WITH PROPOSED VEHICULAR TRAFFIC. | | | 8. BASE FLOOD ELEVATION IS 7.0' NGVD-29. WHAT IS | | | PROPOSED FINISH FLOOR? SHEET A12 SHOWS ENTRANCE AT | | | 7.50' BUT ENG. PLANS SHOW EXISTING AS 4.0'+/-. |
| |
Print |
|