| 2013-12-11 09:45:56 | 1. PARCEL LINE BEARINGS AND DISTANCES NOT SHOWN ON THE |
| | BOUNDARY SURVEY. |
| | 2. CONDITION ASSESSMENT OF THE EXISTING STORMWATER |
| | PIPES ON THE PROPERTY TO BE PROVIDED. |
| | 3. ON CONCEPTUAL SITE ENGINEERING PLAN SHEET 1 OF 2, CB |
| | #3 IS LISTED TO BE CONSTRUCTED OVER 24" RCP. PIPE IS |
| | LABELED AS 36" RCP TO THE WEST OF CB. |
| | 4. CB'S #1, #2, AND #3 SHOULD BE CONSTRUCTED WITH |
| | BAFFLES ON THE EAST WALL TO PREVENT FLOATABLES FROM |
| | FLOWING INTO LAKE WORTH LAGOON AND WITH SUMPS TO |
| | COLLECT SEDIMENTWITHIN THE DRAINAGE PIPES. |
| | 5. SHOW UTILITIES ON THE LANDSCAPE PLANS. AVOID |
| | PLANTING TREES WITHIN FIVE FEET EITHER SIDE OF UTILITY |
| | LINES. |
| | 6. SHOW THE PROPOSED FINISHED FLOOR ELEVATION ON THE |
| | ENGINEERING PLAN. HOW WILL THE FINISHED FLOOR |
| | TRANSITION TO THE EXISTING PARKING ON THE NORTH SIDE. |
| | 7. THE SOUTH ELEVATION (SHEET A11) SHOWS THE DOCK LEVEL |
| | WITH THE SEAWALL WALKWAY. THE NORTH ELEVATION (SHEET |
| | A11B) SHOWS THE DOCK LOWER THAN THE WALKWAY. |
| | 8. PROVIDE COPY OF SFWMD ERP BEFORE START OF |
| | CONSTRUCTION. |
| | 9. NPDES STORMWAER CONSTRUCTION PERMIT TO BE OBTAINED |
| | BEFORE START OF CONSTRUCTION. |
| | 9. PROVIDE SWPPP AND FINAL PAVING, GRADING AND DRAINAGE |
| | PLANS WITH ENGINEERING PERMIT APPLICATION. |
| | |
| | TRACY L. WARD, P.E. |
| | SENIOR STORM WATER ENGINEER |
| | ENGINEERING AND PUBLIC WORKS DEPARTMENT |
| | (561) 494-1120. |
| |