| Plan Review Notes For Project Z13100021 |
| Project Number |
Z13100021 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2013-11-13 07:35:59 | 1. CONSTRUCTION OF CITY'S LAKEWOOD-EDMOR PHASE 2 | | | PROJECT, INCLUDING ROADWAY AND UTILITY IMPROVEMENTS ON | | | NOTTINGHAM BLVD AND GEORGIA AVENUE, WILL BE STARTING IN | | | 2014. | | | 2. 15.00 SWALE CONTOUR ALONG NORTH PROPERTY LINE | | | APPEARS TO BE HIGHER THAN THE BACK OF SIDEWALK GRADE | | | TOWARD THE WEST END. | | | 3. SHOW UTILITIES ON THE LANDSCAPE PLANS. | | | 4. SUBMIT WITH THE ENGINEERING PERMIT APPLICATION THE | | | EXFILTRATION TEST RESULTS FOR THE STORMWATER TRENCH | | | CALCULATIONS | | | 5. SWPPP PLAN SHOULD INCLUDE BMP MEASURES FOR | | | PROTECTING THE OFFSITE (ROADWAY) DRAINAGE STRUCTURES. | | | 6. SIDEWALKS IN FRONT OF NEW DRIVEWAYS SHALL BE | | | REPLACED WITH 6" THICK SIDEWALK PER CITY'S ENGINEERING | | | STANDARD DETAILS. | | | 7. CURBS IN FRONT OF NEW DRIVEWAYS SHALL BE REPLACED | | | WITH DROP CURB. | | | 8. DRIVEWAY APRONS TO BE ABANDONED SHALL BE REPLACED | | | WITH NEW CURB AND SIDEWALK. | | | 9. REGARDING THE PROPOSED LANDSCAPE BULBOUTS ON GEORGIA | | | AVENUE: | | | A. LANDSCAPE ISLANDS TO BE DESIGNED SO THAT THE ROADWAY | | | DRAINAGE IS NOT IMPEDED. | | | B. A WATER MAIN IS PROPOSED ALONG THE WEST SIDEWALK OF | | | GEORGIA AVENUE. THERE IS/ARE EXISTING GAS MAIN(S) NEAR | | | THE WEST EDGE OF PAVEMENT OG GEORGIA AVE. | | | C. AVOID PLANTING TREES WITHIN 5 FEET OF UTILITIES. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | 561-494-1120 |
| |
Print |
|