| 2013-11-22 15:09:28 | PURSUANT TO EMAIL FROM BRIAN COLLINS, CITY TRAFFIC |
| | ENGINEER, DATED 11/22/2013 (SEE ATTACHED)... |
| | |
| | I HAVE REVIEWED THE LATEST TRAFFIC STUDY, DATED |
| | NOVEMBER 2013, FOR THE PROPOSED TRG NORTH FLAGLER |
| | DEVELOPMENT. THIS STUDY ADDRESSES THE COMMENTS AND |
| | ISSUES PREVIOUSLY RAISED. IF APPROVED, I RECOMMEND THE |
| | FOLLOWING CONDITIONS: |
| | |
| | CHANGE TRAFFIC FLOW ON 40TH STREET BETWEEN FLAGLER |
| | DRIVE TO SPRUCE AVENUE FROM ONE-WAY TO TWO WAY. |
| | APPLICANT TO IMPLEMENT SIGNAL MODIFICATIONS AND CHANGES |
| | TO SIGNAGE AND STRIPING. PLANS WILL BE SUBMITTED TO, |
| | AND APPROVED BY, THE CITY OF WEST PALM BEACH |
| | ENGINEERING AND PUBLIC WORKS DEPARTMENT SIGNAL |
| | MODIFICATIONS TO BE COORDINATED WITH, AND APPROVED BY |
| | PALM BEACH COUNTY TRAFFIC DIVISION. |
| | APPLICANT TO CONSTRUCT NORTHBOUND LEFT TURN LANE ON |
| | FLAGLER DRIVE AT 45TH STREET. DESIGN TO BE APPROVED BY |
| | THE CITY OF WEST PALM BEACH ENGINEERING AND PUBLIC |
| | WORKS DEPARTMENT. |
| | APPLICANT WILL WORK WITH STAFF TO DETERMINE SCHEDULING |
| | OF THE ABOVE IMPROVEMENTS. |
| | APPLICANT TO BOND AND CONSTRUCT, WHEN WARRANTED, A |
| | TRAFFIC SIGNAL AT THE INTERSECTION OF FLAGLER DRIVE AND |
| | 45TH STREET. APPLICANT WILL PREPARE TRAFFIC SIGNAL |
| | WARRANT STUDIES ANNUALLY STARTING AFTER THE FIRST |
| | OCCUPANCY PERMIT IS ISSUED. |
| | |
| | WITH THESE CHANGES, FLAGLER DRIVE AND ALL STUDY AREA |
| | INTERSECTIONS ARE PROJECTED TO OPERATE AT AN ACCEPTABLE |
| | LEVEL OF SERVICE AT FULL PROJECT BUILD-OUT. |
| | |
| | |
| | BRIAN A. COLLINS, P.E. |
| | CITY TRAFFIC ENGINEER |
| | TRANSPORTATION DIVISION |
| | ENGINEERING AND PUBLIC WORKS DEPARTMENT |
| | CITY OF WEST PALM BEACH |
| | |
| | TEL:(561) 494 - 1040 |
| | FAX:(561) 494 - 1069 |
| |
Print |