Plan Review Notes
Plan Review Notes For Project Z13080024
Project Number Z13080024
Review Stop STORM
Sequence Number 1
Notes
Date Text
2013-09-11 06:48:101. INDICATE IF PROPOSED PROJECT COMPLIES WITH
 SUPPLEMENTAL DISTRICT REGULATIONS 94-307:
 "ALL DEVELOPMENT SHALL PROVIDE FOR ADEQUATE DRAINAGE
 AND STORMWATER MANAGEMENT. COMPLIANCE WITH THE
 STORMWATER MANAGEMENT REQUIREMENTS OF SOUTH FLORIDA
 WATER MANAGEMENT DISTRICT F.A.C. 40E-4, SHALL
 CONSTITUTE COMPLIANCE WITH THIS PROVISION AND WITH THE
 PROVISIONS OF THE CITY'S COMPREHENSIVE PLAN WHICH
 RELATE TO THE AQUIFER RECHARGE AREAS. PROVIDED,
 HOWEVER, THAT THERE SHALL BE NO NEW DRAINAGE OUTFALLS
 INTO LAKE WORTH."
 2. IT APPEARS ONSITE DRAINAGE SYSTEM SOUTH OF 40TH
 STREET IS CONNECTED TO BOTH THE DRAINAGE SYSTEM FROM
 FLAGLER DRIVE AND TO ANOTHER OUTFALL INTO LAKE WORTH.
 THIS WILL ALLOW BYPASS OF THE STORM CEPTOR STRUCTURE.
 3. DRAINAGE EASEMENT FOR THE DRAINAGE SYSTEM FROM
 FLAGLER DRIVE TO THE OUTFALL WILL BE NEEDED. EASEMENT
 WIDTH AND RELATIVE LOCATION TO STORM PIPES TO BE
 DETERMINED.
 4. PLUG EXISTING 66" OUTFALL AT THE SEAWALL AFTER THE
 FLAGLER DRIVE DRAINAGE SYSTEM IS DIVERTED.
 5. ORIENT PLAN SHEETS TO HAVE NORTH ARROW POINTING IN
 SAME DIRECTION ON THE SHEETS.
 6. SFWMD ERP OR ERP MODIFICATION WILL NEED TO BE
 SUBMITTED TO CWPB ENGINEERING SERVICES BEFORE START OF
 CONSTRUCTION.
 7. SWPPP WILL NEED TO BE SUBMITTED WITH THE ENGINEERING
 PERMIT APPLICATION.
 8. FDEP NPDES CONSTRUCTION PERMIT WILL NEED TO BE
 SUBMITTED TO ENGINEERING SERVICES BEFORE START OF
 CONSTRUCTION.
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING AND PUBLIC WORKS DEPARTMENT
 561-494-1120