Plan Review Notes
Plan Review Notes For Project Z13080024
Project Number Z13080024
Review Stop ENG - PPRC
Sequence Number 1
Notes
Date Text
2013-09-11 12:24:39CASE 1445X (Z13080022), 1445Y (Z13080023) AND
 1445Z (Z13080024) RYBOVICH COMMERCIAL MARINE
  
 WATER
 EXISTING WATER UTILITIES ARE ALREADY LOCATED ADJACENT
 TO THE PROPERTY AND TWO (2) TAPS (16 X 12) AND (8 X 12)
 ARE INDICATED.
  
 THE PROPOSED 16 X 12 TAP IS SHOWN ON THE 16? DI
 SUBAQUEOUS LINE THAT CROSSES THE INTER COASTAL WATERWAY
 (ICW) AND SERVES THE NORTHERN PORTION OF THE TOWN OF
 PALM BEACH (TPB). A 12" TAP ON THIS LINE MAY CREATE
 PRESSURE ISSUES FOR THE TPB.
  
 ALSO, THE PROPOSED 8 X 12 TAP MAY NOT PROVIDE ENOUGH
 FLOW/PRESSURE THROUGH THE EXISTING 8" WATER MAIN TO
 PROVIDE SUFFICIENT DOMESTIC/FIRE LINE WATER FLOW TO
 SERVE THE FIVE (5) MULTI STORY CONDOS.
  
 ADDITIONAL FLOW WOULD BE AVAILABLE FROM THE EXISTING
 20" WATER MAIN THAT RUNS NORTH/SOUTH ON BROADWAY/US 1.
 THIS LINE MAY BE TAPPED VIA 38TH STREET WITH A SHORT
 DIRECTIONAL UNDER THE EXISTING PARKING LOT AT THE
 ELEMENTARY SCHOOL ACROSS THE STREET FROM THE EXISTING
 RYBOVICH MARINE LOCATION.
  
  
  
 SANITARY SEWER
 THE PROPOSED TIE-INS TO THE CITY'S SANITARY COLLECTION
 SYSTEM APPEAR UNDERSIZED BOTH FOR THE PROPOSED AND
 EXISTING FLOW DYNAMICS.
  
 THE EXISTING SANITARY SEWER LINE COLLECTS GRAVITY AND
 CASCADING FORCE MAIN (FM) FLOWS FROM THE ENTIRE NORTH
 END OF THE CITY EAST OF FLORIDA GULF COAST RAILROAD
 (FGC) AND ALSO ST. MARY?S HOSPITAL. THIS 24" LINE
 EXPANDS TO 36" (AND TO 42") BEFORE A 36" LINE ENTERS
 LIFT STATION 23 (LS 23) AT CURRY PARK WHICH PUMPS TO
 THE CITY'S 14" FORCE MAIN THAT IS DIRECTLY CONNECTED TO
 THE REGIONAL WASTE WATER PLANT (ECR).
  
 THE PROPOSED TOWERS 3 AND 4 SHOW DOGHOUSE MANHOLE
 CONNECTIONS TO THE 24" GRAVITY MAIN AND THIS WOULD NOT
 BE PREFERRED. THESE FLOWS SHOULD BE COLLECTED BY THE
 EXISTING PRIVATE MASTER LIFT STATION CURRENTLY ON THE
 RYBOVICH SITE.
  
 THE PROPOSED 4" FM TIE-IN TO THE EXISTING 12" FM IS NOT
 PREFERRED BECAUSE THIS LINE IS A CASCADING FLOW TO THE
 DOWNSTREAM MANHOLE. ADDITIONAL FLOW IN THIS LINE MAY
 CAUSE ADDITIONAL HEAD PRESSURE TO THE DISCHARGE OF THE
 UPSTREAM LIFT STATION 26 (LS26).
  
 THE NEED FOR SANITARY SEWER SYSTEM IMPROVEMENTS FOR
 THIS SITE MAY BE A SUBSTANTIAL CHALLENGE FOR THE CITY
 AND THE DEVELOPER.
  
  
  
 STORM WATER
 THE PROPOSED DESIGN ROUTES ALL COLLECTED STORM FLOWS TO
 THE ICW WITH NO DIRECT IMPACT THE CITY?S STORM WATER
 SYSTEM.
  
  
  