| 2013-10-01 01:54:02 | 1. PROPOSED 20' DRAINAGE EASEMENT NEEDS TO BE PROVIDED | | | TO THE HOMEOWNER'S ASSOCIATION THAT MAINTAINS EMBASSY | | | DRIVE. THE EASEMENT SHOULD CONTINUE THROUGH LAKE AREA | | | (OR PROVIDE FLOW EASEMENT THROUGH LAKE ESEMENT) | | | TO THE OUTFALL AT THE NORTHWEST CORNER OF THE SITE. | | | 2. PREVIOUS COMMENTS TO BE ADDRESSES DURING LATER | | | PHASES OF DEVELOPMENT SUBMITTALS. | | | 3. PROPOSED DRAINAGE SYSTEM IS NOT TO HAVE A | | | DETRIMENTAL EFFECT ON THE EXISTING DRAINAGE SYSTEMS | | | DRAINING TO THE PROJECT'S DRAINAGE SYSTEM(S). | | | 4. WILL A 20' LAKE MAINTENANCE EASEMENT ALL ALONG THE | | | LAKES' EDGES BE OBTAINED OR AVAILABLE? | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | 561-494-1120 |
| |