| Date |
Text |
| 2013-09-06 14:14:08 | 1. THE TRAFFIC CIRCLE IS LOCATED LESS THAN 200 FT. FROM |
| | CONGRESS AVENUE WHICH IS CLOSE ENOUGH THAT IT WILL |
| | LIKELY TO CREATE OPERATIONAL ISSUES PARTICULARLY WHEN |
| | THE FUTURE ROADWAY CONNECTION TO THE SOUTH IS |
| | CONSTRUCTED. |
| | |
| | 2. THERE IS A NEED TO DEMONSTRATE, THROUGH THE USE OF |
| | AUTOTURN, THAT GARBAGE TRUCKS AND LARGER MOVING VANS |
| | ARE ABLE TO MAKE THE TURNS FROM THE SOUTHBOUND LANE |
| | APPROACHING THE TRAFFIC CIRCLE ONTO THE EXIT ROAD, AND |
| | WITHIN THE CUL-DE-SACS AND INTERIOR ROADWAYS, AS WELL |
| | AS TURNS INTO THE GATE AREA. |
| | |
| | 3. THE ENTRY ROAD IS 24 FT., THE TRAVEL PATH AROUND THE |
| | CIRCLE IS 30 FT., AND THE SOUTHBOUND APPROACH TO THE |
| | ROUNDABOUT IS 20 FT. - ALL ARE WIDE ENOUGH TO CARRY 2 |
| | LANES OF TRAFFIC. STRIPING AND SIGNAGE SHOULD BE SHOWN |
| | TO DEMONSTRATE HOW THESE ROADWAYS WOULD OPERATE. |
| | |
| | 4. THE ENGINEERING PLAN DEPICTS MEDIAN CURBS |
| | ENCROACHING INTO THE TRAFFIC CIRCLE. |
| | |
| | 5 . ALL REQUIREMENTS RELATED TO A TRAFFIC SIGNAL AND |
| | NORTHBOUND RIGHT TURN LANE ON CONGRESS AVENUE, AS |
| | REQUIRED BY THE COUNTY'S CONCURRENCY APPROVAL LETTER OF |
| | FEBRUARY 26, 2013, SHALL BE INCORPORATED INTO |
| | CONDITIONS OF APPROVAL (PER PAGES 22-23 OF THE DESIGN |
| | GUIDELINES (EXHIBIT E TO RESOLUTION 6-13). |
| | |
| | 6. ALL OFF SITE IMPROVEMENTS ON CONGRESS AVENUE NEED TO |
| | BE APPROVED AND PERMITTED BY PALM BEACH COUNTY. |
| |