2013-09-06 14:14:081. THE TRAFFIC CIRCLE IS LOCATED LESS THAN 200 FT. FROM
 CONGRESS AVENUE WHICH IS CLOSE ENOUGH THAT IT WILL
 LIKELY TO CREATE OPERATIONAL ISSUES PARTICULARLY WHEN
 THE FUTURE ROADWAY CONNECTION TO THE SOUTH IS
 CONSTRUCTED.
  
 2. THERE IS A NEED TO DEMONSTRATE, THROUGH THE USE OF
 AUTOTURN, THAT GARBAGE TRUCKS AND LARGER MOVING VANS
 ARE ABLE TO MAKE THE TURNS FROM THE SOUTHBOUND LANE
 APPROACHING THE TRAFFIC CIRCLE ONTO THE EXIT ROAD, AND
 WITHIN THE CUL-DE-SACS AND INTERIOR ROADWAYS, AS WELL
 AS TURNS INTO THE GATE AREA.
  
 3. THE ENTRY ROAD IS 24 FT., THE TRAVEL PATH AROUND THE
 CIRCLE IS 30 FT., AND THE SOUTHBOUND APPROACH TO THE
 ROUNDABOUT IS 20 FT. - ALL ARE WIDE ENOUGH TO CARRY 2
 LANES OF TRAFFIC. STRIPING AND SIGNAGE SHOULD BE SHOWN
 TO DEMONSTRATE HOW THESE ROADWAYS WOULD OPERATE.
  
 4. THE ENGINEERING PLAN DEPICTS MEDIAN CURBS
 ENCROACHING INTO THE TRAFFIC CIRCLE.
  
 5 . ALL REQUIREMENTS RELATED TO A TRAFFIC SIGNAL AND
 NORTHBOUND RIGHT TURN LANE ON CONGRESS AVENUE, AS
 REQUIRED BY THE COUNTY'S CONCURRENCY APPROVAL LETTER OF
 FEBRUARY 26, 2013, SHALL BE INCORPORATED INTO
 CONDITIONS OF APPROVAL (PER PAGES 22-23 OF THE DESIGN
 GUIDELINES (EXHIBIT E TO RESOLUTION 6-13).
  
 6. ALL OFF SITE IMPROVEMENTS ON CONGRESS AVENUE NEED TO
 BE APPROVED AND PERMITTED BY PALM BEACH COUNTY.