| Plan Review Notes For Project Z13080021 |
| Project Number |
Z13080021 |
|
| Review Stop |
ENG - PPRC |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2013-09-11 12:26:05 | CASE 1624C (Z13080020) AND 1624D (Z13080021) PCC RESORT | | | | | | WATER | | | THE PLANS (POD A) INDICATE THAT THE PROPOSED WATER MAIN | | | WILL BE FED BY THREE (3) 8" TAPS TO THE EXISTING 10" | | | MAIN. THE 8" LINE TAP SOUTH OF THE MAIN ENTRANCE SHOULD | | | ELIMINATE THE CONCERN OF THE PROPOSED "TEMPORARY WATER | | | MAIN END" LOCATED AT THE END OF THE CUL DE SAC. | | | | | | A CAPACITY ANALYSIS MAY BE REQUIRED TO INVESTIGATE THE | | | NECESSITY OF CONNECTING THE EXISTING 10" WATER MAIN | | | THAT CURRENTLY STOPS ON EITHER SIDE (NORTH (8" DI) AND | | | SOUTH (10" DI)) OF THE BRIDGE AT THE M-CANAL. | | | | | | THE PROPOSED MASTER CONCEPTUAL PLAN IS SUFFICIENT AS | | | CURRENTLY DESIGNED. | | | | | | | | | SANITARY SEWER | | | THERE ARE TWO (2) PROPOSED LIFT STATIONS, ONE FOR POD A | | | AND A SECOND STATION PLANNED FOR THE RESORT CLUB. | | | | | | THE POD A LIFT STATION REQUIRES CONSTRUCTION OF A NEW | | | 4" FORCE MAIN TO CONNECT TO THE CITY'S EXISTING LIFT | | | STATION #77 (LS 77). THIS STATION WAS BUILT IN 1971 | | | UTILIZES A DRY CAN/WET CAN STATION DESIGN THAT WILL | | | REQUIRE UPGRADE IN THE NEAR FUTURE. | | | | | | IT MAY BE MORE COST EFFICIENT TO COMBINE THE NEED FOR A | | | NEW LIFT STATION AT POD A ALONG WITH THE CITY'S NEED TO | | | UPGRADE LS 77 INTO A SINGLE LIFT STATION TO SATISFY | | | BOTH AREAS. | | | | | | | | | STORM WATER | | | THE CURRENT DESIGN ROUTES ALL OF COLLECTED STORM FLOWS | | | TO THE ONSITE PONDS AND LAKES. | | | | | | | | | |
| |
Print |
|