Plan Review Notes
Plan Review Notes For Project Z13080018
Project Number Z13080018
Review Stop STORM
Sequence Number 1
Notes
Date Text
2013-09-11 09:02:261. SHOW PROPOSED AND EXISTING UTILITIES ON LANDSCAPE
 PLANS.
 2. SHOW PROPOSED AND EXISTING UTILITIES ON LIGHTING
 PLAN.
 3. NEW DRAINAGE STRUCTURES SHOULD INCLUDE SUMPS AND
 BAFFLES TO REDUCE THE DISCHARGE OF SEDIMENT AND
 FLOATABLES INTO THE ROAD DRAINAGE SYSTEM (WHICH
 INCLUDES EXFILTRATION TRENCHES).
 4. SFWMD ERP OR ERP MODIFICATION WILL NEED TO BE
 SUBMITTED TO CWPB ENGINEERING SERVICES BEFORE START OF
 CONSTRUCTION.
 5. SWPPP WILL NEED TO BE SUBMITTED WITH THE ENGINEERING
 PERMIT APPLICATION.
 6. FDEP NPDES CONSTRUCTION PERMIT WILL NEED TO BE
 SUBMITTED TO ENGINEERING SERVICES BEFORE START OF
 CONSTRUCTION.
 7. SUBMIT SIGNED AND SEALED DRAINAGE CALCULATIONS WITH
 THE ENGINEERING PERMIT APPLICATION DEMONSTRATING THE
 PROPOSED DEVELOPMENT LAND USE IS CONSISTENT WITH THE
 DESIGN ASSUMPTIONS FOR THE OVERALL MASTER DRAINAGE
 SYSTEM.
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING AND PUBLIC WORKS DEPARTMENT
 561-494-1120