2013-09-11 10:12:27CASE 950NNN (Z13080018) CONVENTION CENTER HOTEL
  
 WATER
 EXISTING WATER UTILITIES ARE ALREADY LOCATED ADJACENT
 TO THE PROPERTY FOR THE FIRE LINE TAP (10 X 8) AND
 DOMESTIC WATER (12 X 12).
  
 HOWEVER, THE CONVENTION CENTER AND THE EXISTING HIGH
 RISE ALSO SHARE FROM THESE MAINS. A CAPACITY STUDY MAY
 BE NECESSARY TO CALCULATE THE DEMAND FLOW RESPECTIVE OF
 THESE EXISTING STRUCTURES AND USE.
  
 THE DDC AND DOMESTIC BACKFLOW PREVENTER FOR THE
 CONVENTION CENTER ARE CURRENTLY LOCATED AT THE
 SOUTHEAST CORNER OF THE PROPOSED HOTEL SITE WITHIN FEET
 OF THE HOTELS? MASTER METER. IN FUTURE MRO TASKS, THIS
 ARRANGEMENT MAY LEAD TO CONFUSION.
  
 SANITARY SEWER
 THERE ARE TWO (2) SANITARY MANHOLES PROPOSED, HOWEVER
 SSMH #1 IS OF A DOG HOUSE DESIGN AND BASED ON FLOW, MAY
 NOT BE ALLOWED FOR CONNECTION TO THE GRAVITY MAIN. A
 MANHOLE WITH TAPERED INVERT CHANNELS MAY BE PREFERRED.
  
 THERE ARE TWO (2) CONNECTIONS TO EXISTING SANITARY LINE
 PROPOSED THAT MAY REQUIRE NEW MANHOLES TO COLLECT FLOW.
 THE CURRENT DESIGN SHOWN IS FOR 6" TIE-IN WYES TO THE
 MAIN WHICH MAY ARE NOT PREFERRED.
  
 THE COLLECTED FLOWS ARE THEN TRANSMITTED THROUGH THE
 NORTHERN PORTION OF FLAMINGO PARK, A RESIDENTIAL AREA.
 A CAPACITY ANALYSIS MAY BE REQUIRED TO FULLY UNDERSTAND
 THE IMPACT OF THESE ADDITIONAL GRAVITY FLOWS.
  
 STORM WATER
  
 THE CURRENT DESIGN ROUTES THE ALL STORM FLOWS TO THE
 84" RCP STORM WATER SYSTEM THAT SERVES THE CONVENTION
 CENTER, KRAVIS CENTER AND CITY PLACE.
  
 ADDITIONAL ATTENTION SHOULD BE CONSIDERED FOR THE
 NUMBER OF "CONNECTIONS TO EXISTING" DRAINAGE STRUCTURES
 AND CATCH BASINS. THESE ADDITIONAL FLOWS MAY IMPACT
 THESE APPURTENANCES BEYOND THEIR CURRENT DESIGN
 PARAMETERS.
  
  
  
  
  
  