| 2013-08-01 06:22:37 | PLANNING BOARD CASE NO. 1639 (Z13070045) |
| | 1009 BANYAN BOULEVARD |
| | DEVELOPMENT OF SIGNIFICANT IMPACT (DSI) |
| | CONSTRUCT AN EXPANSION TO THE EXISTING WATER TREATMENT |
| | PLANT AND RELATED SITE IMPROVEMENTS |
| | |
| | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS |
| | COMPLETE DRAWINGS WERE NOT PROVIDED. ADDITIONAL |
| | COMMENTS CAN BE EXPECTED WHEN COMPLETE DRAWINGS ARE |
| | SUBMITTED. |
| | |
| | 1. PLEASE SUBMIT COMPLETE ARCHITECTURAL, MECHANICAL, |
| | ELECTRICAL, PLUMBING, FIRE SPRINKLER AND FIRE ALARM |
| | PLANS TO THE CONSTRUCTION SERVICES DEPARTMENT FOR |
| | REVIEW. |
| | |
| | 2. THE NEW FIRE HYDRANT LOOP DISPLAYED ON SHEET C-2 IS |
| | TO BE GIVEN CONSTRUCTION PRIORITY FOR INSTALLATION. |
| | |
| | 3. ALL DEMOLITION, RENOVATION, AND CONSTRUCTION TO |
| | COMPLY WITH NFPA 241. |
| | |
| | 4. SUITABLE ACCESS LANES AND ROADS SHALL BE PROVIDED |
| | FOR FIRE RESCUE USE DURING CONSTRUCTION AND RELOCATION |
| | ACTIVITIES AT THE PLANT. |
| | |
| | 5. ALL ELECTRICAL WORK IS COMPLY WITH NFPA 70, THE |
| | NATIONAL ELECTRICAL CODE. |
| | |
| | 6. ALL CHEMICALS ASSOCIATED WITH PLANT OPERATIONS ARE |
| | TO BE STORED, HANDLED, PROCESSED, AND TRANSFERED PER |
| | RECOGNIZED SAFETY REGULATIONS AND STANDARDS. |
| | |
| | 7. THE INSTALLATION OF ANY LANDSCAPING SHALL NOT |
| | INTERFERE WITH ACCESS TO ANY FIRE PROTECTION SYSTEMS OR |
| | DEVICES. |
| | |
| | 8. MORE DETAILS NEEDED ON THE "VEHICULAR ACCESS |
| | RESTRICTION DEVICES" REFERENCED ON SEVERAL SHEETS OF |
| | THE DRAWINGS. |
| | |
| | DENIED |
| | |
| | |
| | MICHAEL E. CARSILLO, ASSISTANT FIRE CHIEF |