| Date |
Text |
| 2013-11-06 16:31:40 | 1. REMOVE REFERENCES TO RIVIERA BEACH IN CONSTRUCTION |
| | NOTES 3 AND 26 ON SHEET C-1 AND IN SIGNING AND PAVEMENT |
| | MARKING NOTE A ON SHEET C-6. |
| | 2. IN COSNTRUCTION NOTE 63 ON SHEET C-1, THE OWNER OR |
| | CONTRACTOR AND NOT THE CITY WILL BE RESPONSIBLE FOR THE |
| | COSTS OF ALL DENSITY TESTS. |
| | 3. LIST THE ELEVATION DATUM ON THE PAVING, GRADING AND |
| | DRAINAGE PLAN (SHEET C-3) |
| | 4. THE CURB AT THE SOUTH DRIVEWAY SHOULD NOT EXTEND |
| | ACROSS THE SIDEWALK. |
| | 5. CONSIDER RAISING THE EDGE OF PAVEMENT SPOT GRADE AT |
| | THE SOUTH FLUME INTO THE WEST DRY RETENTION AREA (DRA). |
| | THE CURRENT PROPOSED GRADE IS EQUAL TO THE CONTOUR |
| | INTERVAL OF THE DRA. |
| | 6. NO CURBING SHOWN ALONG SIDE THE HANDICAP PARKING |
| | SPACES. WILL THE SIDEWALK BE FLUSH WITH THE PAVEMENT OR |
| | HAVE A THICKENED EDGE? PROVIDE A SIDEWALK DETAIL IF THE |
| | LATTER CONDITION. |
| | 7. SHEET C-4 SHOWS DETAILS FOR CLOSED FLUME INLET. ANY |
| | REASON WHY AN OPEN FLUME CANNOT BE USED? |
| | 8. SIGNING AND MARKING PLAN (SHEET C-6) DOESN'T MATCH |
| | THE SITE PLAN: (A) ACCESSIBLE PARKING SPACE DETAIL; (B) |
| | H.C. SIGN LOCATIONS; (C) H.C. SIGN FINE AMOUNT. |
| | 9. SHOW AND LABEL THE TAMARIND AVE MAINTENANCE |
| | RIGHT-OF-WAY LINE ALONG WEST PROPERTY LINE ON SITE |
| | PLAN. |
| | 10. VERIFY STANDARD PARK SPACE COUNT ON SITE PLAN. |
| | 11. SHOW ON THE SITE PLAN THE DRA'S ALONG THE NORTH AND |
| | SOUTH PROPERTY LINES AS INDICATED ON SHEET C-3. |
| | |
| | TRACY L. WARD, P.E. |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING AND PUBLIC WORKS DEPARTMENT |
| | 561-494-1120 |
| | |
| | |
| | |
| | |
| |