| Plan Review Notes For Project Z13060012 |
| Project Number |
Z13060012 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2013-07-08 12:12:34 | 1. PROVIDE COPY OF SFWMD ERP OR NO-NOTICE PERMIT PRIOR | | | TO START OF CONSTRUCTION. | | | 2. PROVIDE COPY OF NPDES NOI PERMIT PRIOR TO START OF | | | CONSTRUCTION. | | | 3. PROVIDE DRAINAGE CALCULATIONS, INCLUDING LAND USE | | | BREAKDOWN (PERVIOUS, IMPERVIOUS, BUILDING, ETC), WATER | | | QUALITY TREATMENT, ETC., WITH THE CITY'S ENGINEERING | | | PERMIT APPLICATION. | | | 4. PROVIDE SWPPP PLAN WITH THE CITY'S ENGINEERING | | | PERMIT APPLICATION. | | | 5. PROVIDE PAVING, GRADING AND DRAINAGE PLAN(S) WITH | | | ENGINEERING PERMIT APPLICATION. | | | 6. DRAINAGE SYSTEM TO BE DESIGNED FOR 3-YEAR 1-HOUR | | | DESIGN STORM. | | | 7. CONSIDER CONNECTING TO EXISTING DRAINAGE INLET ON | | | OLD OKEECHOBEE ROAD. | | | | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | (561) 494-1120 | | | |
| |
Print |
|