Plan Review Notes
Plan Review Notes For Project Z13050021
Project Number Z13050021
Review Stop POLICE
Sequence Number 1
Notes
Date Text
2013-06-12 11:50:52BUILDINGS ALONG PBL BLVD OUTPARCELS (BLDG D,E,F,G,H),
 POWER CENTER (A,B,BII,C) SHALL COMPLY WITH BELOW
 GUIDELINES.
  
 ** AT THIS TIME THERE IS NOT ENOUGH SUFFICIENT
 INFORMATION FOR COMMENT ON EACH BUILDING. ADDITIONAL
 INFORMATION WILL BE REQUESTED, AND THE POLICE
 DEPARTMENT WILL HAVE ADDITIONAL COMMENTS AS THE REVIEW
 PROCESS CONTINUES. THE CRIME PREVENTION OFFICER WILL
 PERIODICALLY BE ON SITE TO ENSURE CPTED PLANS ARE BEING
 FOLLOWED.
  
  
 THE POLICE DEPARTMENT RECOMMENDS C.P.T.E.D. PRINCIPLES
 AND A RISK AND VULNERABILITY ASSESSMENT ARE INTRODUCED
 INTO THE DESIGN STAGE. FOR A BUILDING TO BE TRULY
 SECURE, SECURITY CONSIDERATIONS MUST BE IN THE
 ARCHITECTURAL DRAWINGS FROM THE BEGINNING.
 CPTED INVOLVES DESIGNING THE BUILT ENVIRONMENT TO
 REDUCE THE OPPORTUNITY FOR CRIME AND DISORDER. THIS
 APPROACH TO SECURITY DESIGN RECOGNIZES THE INTENDED USE
 OF SPACE IN A BUILDING AND IS DIFFERENT FROM
 TRADITIONAL SECURITY PRACTICES, WHICH FOCUSES ON
 DENYING ACCESS TO A CRIME TARGET WITH BARRIERS AND
 TECHNIQUES SUCH AS LOCKS, ALARMS, FENCES, AND GATES.
 CPTED TAKES ADVANTAGE OF OPPORTUNITIES FOR NATURAL
 SURVEILLANCE, ACCESS CONTROL AND TERRITORIAL
 REINFORCEMENT. THE DESIGN PROCESS SHOULD INCLUDE CPTED
 SO THAT NATURAL AND NORMAL USES OF THE ENVIRONMENT WILL
 MEET THE SAME GOALS AS PHYSICAL AND TECHNICAL
 PROTECTION METHODS.
  
  
 1. PRIOR TO THE ISSUANCE OF THE FIRST BUILDING PERMIT,
 THE APPLICANT SHALL SUBMIT A CONSTRUCTION SITE SECURITY
 AND MANAGEMENT PLAN FOR REVIEW AND APPROVAL BY THE
 POLICE DEPARTMENT. AFTER SITE CLEARING AND PLACEMENT OF
 CONSTRUCTION TRAILERS, THE DEVELOPER/PROJECT MANAGER
 SHALL INSTITUTE SECURITY MEASURES TO REDUCE OR
 ELIMINATE OPPORTUNITIES FOR THEFT. THE MANAGEMENT PLAN
 SHALL INCLUDE, BUT NOT BE LIMITED TO, TEMPORARY
 LIGHTING, SECURITY PERSONNEL, VEHICLE BARRIERS,
 CONSTRUCTION/VISITOR PASS, REDUCE/MINIMIZE ENTRY/EXIT
 POINTS, ENCOURAGE SUBCONTRACTORS TO SECURE MACHINERY,
 TOOLS AT END OF WORK DAY, FENCING WITH SCREENING AND OR
 ANY OTHER MEASURE DEEMED APPROPRIATE TO PROVIDE A SAFE
 AND SECURE WORKING ENVIRONMENT. NONCOMPLIANCE WITH THE
 APPROVED SECURITY AND MANAGEMENT PLAN MAY RESULT IN A
 STOP-WORK ORDER. NO TRESPASSING SIGNS NEED TO BE POSTED
 EVERY FIVE-HUNDRED FEET (500) AROUND THE PERIMETER OF
 THE CONSTRUCTION SITE AND A SIGNED AFFIDAVIT NEEDS TO
 BE ON FILE WITH THE WEST PALM BEACH POLICE DEPARTMENT
 (561-822-1620)
  
  
 2. PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF
 OCCUPANCY NUMERICAL ADDRESSES SHALL BE PLACED AT THE
 FRONT AND REAR OF THE BUILDING. EACH NUMERICAL ADDRESS
 SHALL BE ILLUMINATED FOR NIGHTTIME VISIBILITY WITH AN
 UNINTERRUPTIBLE A.C. POWER SOURCE, SHALL BE A DIFFERENT
 COLOR THAN THE COLOR OF THE SURFACE TO WHICH IT IS
 ATTACHED. THE REAR DOORS OF THE BUILDING SHALL HAVE AN
 ILLUMINATED NUMBERS ON OR ALONG SIDE THE DOOR.
  
 3. PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF
 OCCUPANCY ALL ON-SITE LIGHTING SHALL BE INSTALLED. ALL
 ON-SITE LIGHTING SHALL CONSIST OF LED WITH FULL CUT OFF
 FIXTURE AND LIGHTING SHALL NOT CONFLICT WITH PLANTED
 LANDSCAPING. LUMINARY TYPE SHOULD OPTIMIZE LIGHT
 DISTRIBUTION AND MINIMIZE GLARE AN UP LIGHTING.
  
 4. PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF
 OCCUPANCY THE APPLICANT SHALL PROVIDE PHOTOCELL SENSOR
 ENGAGED DUSK TO DAWN LIGHTING IN THE REAR OF ALL
 BUILDINGS AND SENSITIVE AREAS.
  
 5. PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY
 FOR THE BUILDING, THE FOLLOWING SECURITY MEASURES SHALL
 BE INSTALLED, AND REVIEWED AND APPROVED BY THE POLICE
 DEPARTMENT.
 A. SENSITIVE AREAS SHALL BE EQUIPPED WITH AN INTRUSION
 ALARM/CCTV SYSTEM.
 B. DOORS SHALL BE EQUIPPED WITH METAL PLATE OVER
 THRESHOLD OF THE LOCKING MECHANISM. (FRONT AND REAR)
 REAR DOORS OF ALL STORES SHOULD BE HANDLE FREE.
 C. EXTERIOR/INTERIOR PEDESTRIAN DOORS WHICH PROVIDE
 ACCESS TO THE OUTSIDE SHALL BE SOLID CORE, EQUIPPED
 WITH AUTOMATIC HYDRAULIC CLOSURE DEVICE AND A MINIMUM
 100 SQUARE INCH VISION PANEL. WHERE APPLICABLE
 EMERGENCY DOORS SHALL HAVE NO EXTERIOR HANDLES. PANIC
 HARDWARE SHALL HAVE SELF LOCKING MECHANISM, MAY HAVE
 ONE LOCKING POINT AND SHALL HAVE A PROTECTIVE ASTRAGAL
 ATTACHED TO THE EXTERIOR OF THE DOOR, WHICH WILL COVER
 OPENING BETWEEN THE DOOR AND FRAME, IT SHOULD EXTEND
 ONE INCH BEYOND EDGE OF THE DOOR TO WHICH IT IS
 ATTACHED.
 D. ALL DOORS THAT EXIT OUT SHALL HAVE A 180 DEGREE VIEW
 HOLES.
 E. CASE HARDENED COMMERCIAL GRADE DEAD BOLT LOCKS SHALL
 BE INSTALLED ON ALL STORE FRONTS AND SENSITIVE AREA
 DOORS WITH MINIMUM OF ONE INCH THROW INTO THE STRIKE
 RECEIVING THE BOLT. THE CYLINDER SHALL HAVE A CYLINDER
 GUARD (SPIN GUARD) AND A MINIMUM OF FIVE-PIN TUMBLERS.
 F. DOOR HINGES SHALL BE INSTALLED ON INTERIOR SIDE OF
 DOOR OR NON REMOVABLE HINGE PINS OR A MECHANICAL
 INTERLOCK TO PRECLUDE REMOVAL OF DOOR FROM THE
 EXTERIOR.
 G. RESTROOMS SHALL BE PLACED IN CENTRAL AREA
 H. A HIGH RESOLUTION COLOR DIGITAL WIDE ANGLE VIDEO
 CAMERA SYSTEM WITH MONITORING, PHOTO PROCESSING, FREEZE
 FRAME AND ZOOM (PTL) CAPABILITIES SHALL BE INSTALLED IN
 THE INTERIOR AND EXTERIOR AREAS OF A BUSINESS/BUILDING.
 J. DOORS SECURED BY ELECTRICAL OPERATION SHALL HAVE A
 KEY PAD-SWITCH TO OPEN
 THE DOOR WHEN IN A CLOSED POSITION, OR BY A SIGNAL
 LOCKING DEVICE.
 K. INSTALL PEDESTRIAN SCALE LIGHTING WITH FULL CUT OFF
 FIXTURES ALONG WALKWAYS.
 L. CROSSWALKS SHALL BE RAISED OR DELINEATED BY THE USE
 OF CONTRASTING PAVER BLOCKS AS OPPOSED TO SURFACE
 STRIPING.
 M. BENCHES SHALL BE DIVIDED STYLE AND HAVE ADEQUATE
 LIGHTING IN THE AREA THEY ARE LOCATED. BENCHES SHOULD
 ALSO BE IN OPEN VIEW TO ELIMINATE CONCEALMENT AREAS.
 O. BIKE RACKS SHOULD BE IN A HIGH VISIBILITY AREA, NOT
 IN THE PARKING LOT, FOR EASY SURVEILLANCE AND SAFETY.
 P. WAY FINDING SIGNS SHOULD BE IN HIGH TRAFFIC AREAS
  
  
  AUTOMATED TELLER MACHINES
 ATM LOCATIONS SHALL BE IN AREAS WITH THE GREATEST
 NATURAL SURVEILLANCE AND INDEPENDENT FROM THE BUILDING.
 A. AUTOMATED TELLER MACHINES (ATM?S) SHALL COMPLY WITH
 FSS 655.966.
 B. ATM?S SHALL BE LOCATED ON MAIN ROADS IF APPLICABLE
 AND BE VISIBLE FROM THE ROADWAY.
 C. ATMS SHALL NOT BE HIDDEN BY ANY LANDSCAPING OR OTHER
 FIXED OBJECT THAT WOULD PREVENT CLEAR VISIBILITY.
 D. ATMS SHALL HAVE HIGH-RESOLUTION COLOR DIGITAL VIDEO
 CAMERA SYSTEM INSTALLED.
 E. ATMS SHALL HAVE HIGH ILLUMINATION OF WALKWAYS
 LEADING TO AND FROM IT.
 F. LIGHTING SHALL BE POSITIONED SO AS NOT TO CAUSE
 GLARE ON VIDEO RECORDING.
 G. CONVEX MIRROR SHALL BE INSTALLED AND STRATEGICALLY
 PLACED TO ALLOW ATM OPERATOR TO IDENTIFY ANY
 APPROACHING PERSON(S) AND/OR POTENTIAL SUSPECT(S).
 H. ATMS SHALL HAVE AN ALARM SYSTEM COMPONENT, SHOCK AND
 SEISMIC SENSORS, SUFFICIENT WEIGHT AND TENSILE
 STRENGTH, HEAT DETECTORS, DOOR CONTACTS AND LOCKING
 MECHANISMS, TO DETER ATTACKS TO THE MACHINE ITSELF.
 DEVICES ARE NEEDED TO PROVIDE EARLY WARNING OF AN
 IMPENDING ATTACK.
 I. ATMS SHOULD HAVE A SECURE CLOSET TO SERVICE THE
 MACHINE.
  
 WHOLE FOODS
  
 WILL COMPLY WITH THE ABOVE GUIDELINES ** AT THIS TIME
 THERE IS NOT ENOUGH SUFFICIENT INFORMATION FOR COMMENT
 FOR THIS BUSINESS. ADDITIONAL INFORMATION WILL BE
 REQUESTED, AND THE POLICE DEPARTMENT WILL HAVE
 ADDITIONAL COMMENTS AS THE REVIEW PROCESS CONTINUES.
 SECURITY: LIGHTING, CCTV, ALARM, INTERIOR LAYOUT
 INFORMATION WILL BE NEEDED.
  
 BUILDING E, BUSINESS WITH DRIVE THRU ATTACHED:
  
 AT THIS TIME THERE IS NOT ENOUGH SUFFICIENT INFORMATION
 FOR COMMENT FOR THIS BUSINESS. ADDITIONAL INFORMATION
 WILL BE REQUESTED, AND THE POLICE DEPARTMENT WILL HAVE
 ADDITIONAL COMMENTS AS THE REVIEW PROCESS CONTINUES.
 THE CRIME PREVENTION OFFICER WILL PERIODICALLY BE ON
 SITE TO ENSURE CPTED PLANS ARE BEING FOLLOWED.
 SECURITY: LIGHTING, CCTV, ALARM, INTERIOR LAYOUT
 INFORMATION WILL BE NEEDED.
  
 BJ?S BREWHOUSE: WILL COMPLY WITH THE ABOVE GUIDELINES,
 RESTAURANT SHALL BE EQUIPPED WITH THE FOLLOWING
 SECURITY DEVICES AND STANDARDS:
 (1) A FULLY FUNCTIONING AND OPERATIONAL CCTV SYSTEM
 CAPABLE OF RECORDING AND RETRIEVING AN IDENTIFIABLE
 IMAGE TO ASSIST IN OFFENDER IDENTIFICATION AND
 APPREHENSION THROUGH OUT THE RESTAURANT, INTERIOR AND
 EXTERIOR. MONITOR IN THE MANAGEMENT OFFICE
 (2) A DROP SAFE OR CASH MANAGEMENT DEVICE FOR
 RESTRICTED ACCESS.
 (3) HEIGHT MARKERS AT THE ENTRANCE AND EXITS WHICH
 DISPLAY HEIGHT MEASURES.
 (4) OUT DOOR DINING WILL HAVE PROPER LIGHTING AND CCTV
 COVERAGE.
 (7) ALL EXITING DOORS WILL HAVE A VIEWING WINDOW, DOOR
 CHIME MOUNTED OUTSIDE AND CCTV COVERAGE
 (8) RESTAURANT SHALL BE EQUIPPED WITH A SILENT ALARM TO
 A PRIVATE SECURITY AGENCY
  
 POWER CENTER WILL COMPLY WITH THE ABOVE GUIDLINES** AT
 THIS TIME THERE IS NOT ENOUGH SUFFICIENT INFORMATION
 FOR COMMENT FOR THIS BUSINESS. ADDITIONAL INFORMATION
 WILL BE REQUESTED, AND THE POLICE DEPARTMENT WILL HAVE
 ADDITIONAL COMMENTS AS THE REVIEW PROCESS CONTINUES.
 SECURITY: LIGHTING, CCTV, ALARM, INTERIOR LAYOUT
 INFORMATION WILL BE NEEDED.
  
  
  
  
  
  
  
  