Plan Review Notes For Project Z13040029
Project Number Z13040029
Review Stop TRAFFIC
Sequence Number 1
Notes
Date Text
2013-05-07 16:54:01A TRAFFIC IMPACT SUDY SHALL BE SUBMITTED TO DETERMINE
 THE IMPACTS ON ADJACENT ROADWAYS AND INTERSECTIONS.
 THIS STUDY SHALL EVALUATE THE INTERSECTIONS OF OLIVE
 WITH BELVEDERE, LAKEVIEW/OKEECHOBEE, AND ALL SITE
 DRIVEWAYS, AND THE INTERSECTIONS OF FLAGLER WITH
 OKEECHOBEE/LAKEVIEW AND ALL SITE DRIVEWAYS. PRIOR TO
 INITIATING THE STUDY, THE TRAFFIC ENGINEER SHALL MEET
 WITH STAFF TO REVIEW TRIP DISTRIBUTION AND OTHER
 ASSUMPTIONS. THE STUDY SHALL INCLUDE THE TRAFFIC IMPACT
 OF THE PROPOSED CHAPEL BY THE LAKE DEVELOPMENT.
  
 TABLE 6 IN THE COMPREHENSIVE PLAN TRAFFIC ANALYIS
 SHOULD BE AMENDED TO REFLECT THAT FLAGLER DRIVE
 /WASHINGTON ROAD IS ONLY 2 LANES SOUTH OF BARCELONA AND
 PARKER AVENUE IS 3 LANES BETWEEN SOUTHERN BOULEVARD TO
 HOWARD PARK.
  
 THE 2 FULL ACCESS DRIVEWAYS ON OLIVE AVENUE ARE ONLY
 100 FT. APART WHICH COULD CREATE OPERATIONAL
 DIFFICULTIES.
  
 THE FORMAL SITE PLAN SHOULD SHOW ALL STOP SIGNS AND
 STOP BARS.