Plan Review Notes
Plan Review Notes For Project Z13040025
Project Number Z13040025
Review Stop FIRE
Sequence Number 2
Notes
Date Text
2013-06-17 11:59:53THE FOLLOWING COMMENTS WERE RECEIVED FROM M. CARSILLO
 VIA EMAIL ON 6/11/13....
  
 THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS OTHER
 REQUIREMENTS MAY BE NECESSARY WHEN A FULL SET OF
 DRAWINGS ARE PROVIDED.
  
 1. SUBMIT COMPLETE PLANS FOR THE PROPOSED MAINTENANCE,
 CENTRAL CHILLER PLANT.
 2. BIKE RACK DETAIL ON SHEET CSP-1 INDICATES BICYCLE
 PARKING WILL BE PROVIDED PER THE OAKTON COMMONS CPD
 DESIGN GUIDELINES.
 3. A FIRE HYDRANT MAY NOT BE CALLED OUT ON SHEET CSP-1,
 SOUTHWEST CORNER. THIS HYDRANT IS SHOWN ON SHEET C-1.
 4. ALL DEMOLITION, RENOVATION, AND CONSTRUCTION TO
 COMPLY WITH NFPA 241. DEMOLITION PERMITS WILL BE
 REQUIRED PRIOR TO COMMENCEMENT OF ANY DEMOLITION
 ACTIVITIES.
 5. ALL ELECTRICAL WORK TO COMPLY WITH NFPA 70, THE
 NATIONAL ELECTRICAL CODE.
 6. ALL UTILITIES ARE TO BE PROPERLY LOCATED PRIOR TO
 EXCAVATION.
 7. LANDSCAPING PLACEMENT NEAR FIRE HYDRANTS SHALL
 PROVIDE A MINIMUM OF AT LEAST 7 ? FEET CLEARANCE TO THE
 FRONT AND SIDES AND AT LEAST 4 FEET TO THE REAR OF
 THEM.
  
 MICHAEL E. CARSILLO, ASSISTANT FIRE CHIEF
 WEST PALM BEACH FIRE RESCUE
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved