| Plan Review Notes For Project Z13040023 |
| Project Number |
Z13040023 |
|
| Review Stop |
STORM |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2014-02-27 09:14:52 | 1. COORDINATE WITH PUBLIC UTILITY DEPARTMENT ON | | | REQUIREMENTS FOR EASEMENT ON THE WATER MAIN. SHOW | | | PROPOSED EASEMENT ON SITE PLANS, ENGINEERING PLANS AND | | | LANDSCAPE PLANS. | | | 2. PHASE 1 IS TO INCLUDE CONSTRUCTION OF THE PERIMETER | | | BERM AROUND THE SITE. | | | 3. SPOT GRADE (21.64) ON WEST PERIMETER BERM IS LOWER | | | THAN THE SFWMD MINIMUM BERM ELEVATION CRITERIA OF | | | 21.82' NGVD. | | | 4. PROVIDE A CROSS SECTION OF THE EXFILTRATION TRENCH | | | AND INDICATE HOW THE STORMWATER RUNOFF WATER LEVEL WILL | | | BE CONTROLLED IN THE TRENCH. | | | 5. LABEL THE CONTOURS (ELEVATIONS) FOR THE SOUTHWEST | | | RETENTION AREA. | | | 6. PREVIOUS COMMENTS REGARDING SUBMITTALS WITH THE | | | ENGINEERING PERMIT APPLICATION AND BEFORE START OF | | | CONSTRUCTION HAVE NOT BEEN ADDRESSED OR ACKNOWLEDGED. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | (561) 494-1120 |
| |
Print |
|