| Plan Review Notes For Project Z13040023 |
| Project Number |
Z13040023 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2013-05-08 12:04:00 | 1. PROVIDE COPY OF SFWMD ERP OR NO-NOTICE PERMIT PRIOR | | | TO START OF CONSTRUCTION. | | | 2. PROVIDE COPY OF NPDES NOI PERMIT PRIOR TO START OF | | | CONSTRUCTION. | | | 3. PROVIDE DRAINAGE CALCULATIONS, INCLUDING LAND USE | | | BREAKDOWN (PERVIOUS, IMPERVIOUS, BUILDING, ETC), WATER | | | QUALITY TREATMENT, ETC., WITH THE CITY'S ENGINEERING | | | PERMIT APPLICATION. | | | 4. PROVIDE SWPPP PLAN WITH THE CITY'S ENGINEERING | | | PERMIT APPLICATION. | | | 5. WILL WATER MAIN HAVE MASTER METER OR WILL EASEMENT | | | OVER THE WATER MAIN BE PROVIDED? | | | 6. COURTYARD DRAINAGE PIPE LOCATED UNDER BUILDING | | | FOUNDATION INSTEAD OF RUNNING TO WEST UNDER THE GROUND | | | LEVEL PARKING. | | | 7. ON CONCEPTUAL ENGINEERING PLAN, SHOW EXFILTRATION | | | TRENCH OUTLINE FOR THE 55' (45') - 15" FRN DRN | | | NORHTWEST OF THE BUILDING. | | | 8. PROVIDE CROSS SECTIONS OF RETENTION AREAS SHOWING | | | SIDE SLOPES AND TOP/BOTTOM ELEVATIONS WITH THE | | | ENGINEERING PLANS WHEN SUBMITTING FOR AN ENGINEERING | | | PERMIT WITH THE CITY. | | | 9. TIE ROOF DRAINS INTO DRAINAGE SYSTEM OR DISCHARGE | | | ONTO PERVIOUS AREAS. | | | 10. WHAT DRAINAGE AREA IS TRIBUTARY TO THE SMALLER | | | RETENTION AREA? | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | (561) 494-1120 | | | |
| |
Print |
|