Plan Review Notes
Plan Review Notes For Project Z13040023
Project Number Z13040023
Review Stop STORM
Sequence Number 1
Notes
Date Text
2013-05-08 12:04:001. PROVIDE COPY OF SFWMD ERP OR NO-NOTICE PERMIT PRIOR
 TO START OF CONSTRUCTION.
 2. PROVIDE COPY OF NPDES NOI PERMIT PRIOR TO START OF
 CONSTRUCTION.
 3. PROVIDE DRAINAGE CALCULATIONS, INCLUDING LAND USE
 BREAKDOWN (PERVIOUS, IMPERVIOUS, BUILDING, ETC), WATER
 QUALITY TREATMENT, ETC., WITH THE CITY'S ENGINEERING
 PERMIT APPLICATION.
 4. PROVIDE SWPPP PLAN WITH THE CITY'S ENGINEERING
 PERMIT APPLICATION.
 5. WILL WATER MAIN HAVE MASTER METER OR WILL EASEMENT
 OVER THE WATER MAIN BE PROVIDED?
 6. COURTYARD DRAINAGE PIPE LOCATED UNDER BUILDING
 FOUNDATION INSTEAD OF RUNNING TO WEST UNDER THE GROUND
 LEVEL PARKING.
 7. ON CONCEPTUAL ENGINEERING PLAN, SHOW EXFILTRATION
 TRENCH OUTLINE FOR THE 55' (45') - 15" FRN DRN
 NORHTWEST OF THE BUILDING.
 8. PROVIDE CROSS SECTIONS OF RETENTION AREAS SHOWING
 SIDE SLOPES AND TOP/BOTTOM ELEVATIONS WITH THE
 ENGINEERING PLANS WHEN SUBMITTING FOR AN ENGINEERING
 PERMIT WITH THE CITY.
 9. TIE ROOF DRAINS INTO DRAINAGE SYSTEM OR DISCHARGE
 ONTO PERVIOUS AREAS.
 10. WHAT DRAINAGE AREA IS TRIBUTARY TO THE SMALLER
 RETENTION AREA?
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING AND PUBLIC WORKS DEPARTMENT
 (561) 494-1120
  