| Plan Review Notes For Project Z13040022 |
| Project Number |
Z13040022 |
|
| Review Stop |
SURVEY |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2013-05-09 08:20:22 | ORIGINAL COMMENTS: | | | 1. SEPARATE EASEMENT MAY BE NEEDED FOR ANY ON-SITE | | | PUBLIC UTILITIES. | | | 2. SITE/CIVIL REVIEW IS REQUIRED THROUGH ENGINEERING | | | SERVICES. | | | 3. BOUNDARY PLAT WILL BE REQUIRED. APPLICATION IS MADE | | | THRU ENGINEERING. | | | | | | ADDITIONAL COMMENTS 5/9/13: | | | | | | 1. ON SURVEY, RENUMBER NOTES OR ADD #'S 8 AND 9. | | | 2. ADD DATUM TO NOTE #10. | | | 3. DEFINE VERTICAL DATUM. | | | 4. EXISTING RETENTION AREA IN ORB 13931/621 WILL NEED | | | TO BE RELEASED OR MODIFIED. | | | 5. REMOVE PROPOSED RETENTION AREA FROM WITHIN THE 25' | | | UE. | | | 6. LANDSCAPING WITHIN 20' UE ALONG EAST LINE WILL NEED | | | APPROVAL OF EASEMENT HOLDER. | | | 7. ON CONCEPTUAL ENG. PLAN, MOVE WATER METER LOCATION | | | TO JUST OUTSIDE FPL EASEMENT. | | | 8. REVISE SANITARY LINE TO CONNECT SOUTH OF PROPOSED | | | CHAPEL WITH CLEANOUT JUST OUTSIDE FPL EASEMENT. | | | 9. REVISE NOTE AND ELEVATIONS TO NGVD 29 ON ENG. PLAN. | | | 10. UNITY OF TITLE WILL BE REQUIRED PRIOR TO PLAT | | | RECORDATION. |
| |
Print |
|